|
<br />.
<br />
<br />.
<br />
<br />e
<br />
<br />
<br />Humberto Castillero, P. E.
<br />
<br />Traffic/Access Management
<br />
<br />15. FIRM NAME AND LOCATION ICilv and Slale)
<br />Eisman & Russo, Inc. (Jacksonville, FL)
<br />
<br />16. EDUCATION IDEGREE AND SPECIALlZA nON)
<br />M.B.A., Indiana University
<br />B.S., Civil Engineering, Clarkson
<br />
<br />17 CURRENT PROFESSIONAL REGISTRATION ISTA TE AND DISCIPLINE)
<br />Professional Engineer, Florida and California
<br />
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oroanizalions. Tr.1lmnq, Awards, etc.)
<br />· ITS Systems Certificate . FOOT Laws & Rules Seminar
<br />
<br />· FOOT Advanced Work Zone Traffic Ctrl . FOOT Excellence/Quality in Project
<br />
<br />· FOOT Design Training Update Management
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> 11\ TITI F ANn I Or.ATION rr.ilv "nr! .';I"IAI I I? ~T~n
<br /> 1-75/SR 93 Milling and Resurfacing from Alachua County to SR 47 Interchange PROFESSIONAL SERVICES I CONSTRUCTION (tl applicable)
<br /> (Hamilton County, FL) 2006 N/A
<br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost, elc) AND SPECIFIC ROLE -iJ Check if project performed with current firm
<br />a. Provided highway construction plans for milling and resurfacing and cross slope adjustment of outside lanes from 2% to 3%.
<br /> Design activities include pavement design cross sections, typical sections, plans, signing and pavement markings and
<br /> maintenance of traffic plans. First section included 9.8 miles of roadway; second section was 5.1 miles. Total Approximate
<br /> Construction Cost- $28,000,000.
<br /> (1) TITLE AND LOCATION (Cllv and State) 12\ YEAR COMPLETED
<br /> Ricker Road from Morse Avenue to Old Middleburg Road PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> (Jacksonville, FL) 2005 2005
<br /> (3) BRIEF DESCRIPTION IBnel scope. size. cost, etc) AND SPECIFIC ROLE ~ Check jf proiect performed with current firm
<br />b. Better Jacksonville Plan: Project Manager. Providing civil engineering design services for widening of 2.9 miles from two-lane
<br /> rural roadway to three-lane urban section, including curb and gutter, sidewalks, bike lanes, lighting, traffic signal installation,
<br /> storm water management improvements, signing and pavement markings, and utility relocation.
<br /> (1) TITLE AND LOCATION (Cltv and State) 12\ YEAR COMPLETED
<br /> Lenox Avenue from Lane Avenue to Ellis Road PROFESSIONAL SERVICES I CONSTRUCTION III applicable)
<br /> (Jacksonville, FL) 2005 2005
<br /> (3) BRIEF DESCRIPTION (Bnel scope, size, cost, etcl AND SPECIFIC ROLE .{] Check jf proiecl performed with current firm
<br />C. Better Jacksonville Plan: Project Manager. Providing civil engineering design services for widening from a two-lane rural
<br /> roadway to a three-lane urban section, including curb and gutter, sidewalk, bike lanes, drainage, signing and marking.
<br /> (1) TITLE AND LOCATION ICilv and Sla/e) 12 YEAR COMPLETED
<br /> J. Turner Butler Widening PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> (Jacksonville, FL) 2005 2005
<br /> (31 BRIEF DESCRIPTION (Bnel scope, SIZe, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. Jacksonville Transportation Authority: Project Manager. Provided civil engineering design services for widening of 3.2 miles of
<br /> J. Turner Butler Boulevard from four to six lanes, as well as widening of five bridge structures. Work included design plans,
<br /> stormwater facilities, signing/pavement marking, signal modifications, lighting, and post design services.
<br /> (1) TITLE AND LOCATION (Cilv and Stale) 12\ YEAR COMPLETED
<br /> Cecil Field Connector PROFESSIONAL SERVICES I CONSTRUCTION (tl applicable)
<br /> (Jacksonville, FL) 2004 2004
<br /> 13\ BRIEF DESCRIPTION IBnelscoDe. size. cost. etc. I AND SPECIFIC ROLE ..J Check if oroiect oerformed with current linn
<br />e. City of Jacksonville: Project Manager. Developed a preliminary design and environmental report to select the most cost
<br /> effective alternative, producing an evaluation matrix for various costs, including roadway construction, R/W acquisition,
<br /> environmental impacts, utility installations, tree mitigation, etc.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE #
<br />
|