Laserfiche WebLink
<br />r---- . <br />I <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />-:;...1. ~- <br /> <br />Gregorio Arimany, EIT <br /> <br />Civil Engineer <br /> <br />3 <br /> <br />.5 <br /> <br />Spill is Candela & Partners. Inc. d/b/a! Spill is Candela DMJM; Coral Gables, FL <br /> <br />B.S. / Civil Engineering /2004/ University of Notre Dame <br /> <br />1100010807/ E.I.T / 2006 <br /> <br />" <br /> <br />- - <br />- - <br /> <br />- <br />-- ---- <br /> <br />Downtown Dadeland Mixed-Use Center & Parking Garage <br />Miami, FL <br /> <br />- - <br />- <br /> <br />- <br />- <br /> <br />2006 <br /> <br />200S <br /> <br />o <br /> <br />A 346,000 mixed-use development incorporating retail, residential, and parking. This multi-building includes retail at grade with <br />six stories of residential above. The 1,000 car parking garage was designed partially below grade, a unique attribute to parking <br />garages built in South Florida. S25 million (est.) <br /> <br />- - <br />Camana Bay Parking Garage & Office Building <br />Grand Cayman, Cayman Islands, BWI <br /> <br />" <br />- <br /> <br />2007 <br /> <br />2009 <br /> <br />0- <br /> <br />---- - - - - <br />Architecture and Engineering for a new six level, 444-car parking garage at the Camana Bay development in Grand Cayman. <br />Integrated within the parking garage are 81,244 SF of office space and 6,576 SF of retail. The project is one component of a <br />larger mixed-use waterfront development and incorporates sustainable design features. Cost Confidential <br /> <br />Cayman International School - K-12 Facility <br />Grand Cayman, Cayman Islands BWI <br /> <br />2006 <br /> <br />2008 <br /> <br />o <br /> <br />- -- -- - -~ - - - - - -- - - <br />The Cayman International School is a private institution located within the 500-acre master-planned community of Camana Bay <br />on Grand Cayman Island. The design concept integrates classrooms, labs, an administration building, a library and a multi- <br />purpose hall with athletic fields and courts. Cost Confidential <br /> <br />Middle School Prototypes MM-1, UU-1, & PP-1 <br />Miami, FL <br /> <br />" <br /> <br />2007 <br /> <br />o <br /> <br />- - - -- --- - - - - - - - - - -- <br />Architectural and Engineering services for the development of a Middle School prototype. Phase I of Middle School project <br />is design and construction of an 116,612 SF prototype facility, to be planned with future expansion in mind. The prototype will <br />subsequently be adapted for new Middle Schools on a minimum of three further sites. <br /> <br />Island Gardens at Watson Island <br />Miami, Florida <br /> <br />2006 <br /> <br />2009 <br /> <br />o <br /> <br />- <br />sland Gardens is a mixed-use development combining hotels, retail, dining, entertainment, gardens and a selection of cultural <br />facilities and public art as an intimate village, adjacent to what will be one of the finest built mega yacht marinas in the world. <br /> <br />AUTHORIZIED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) PAGE 12 <br />