<br />.
<br />
<br />.
<br />
<br />.
<br />
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Complete one Section E for each key person)
<br />12 NAME: 13 ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Elvira Pita Plumbing Engineer
<br />Plumbing Engineer a_ TOTAL I ~ WITH CURRENT FIRM
<br /> 10
<br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />1993/Bachelor of Science 1 Civil Engineeringl Florida International
<br />University
<br />18 OTHER PROFESSIONAL QUALlFICA TIQNS (Publications. Organizaflons. Training. Awards. Ete.)
<br />American Society of Plumbing Engineers
<br /> 19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED
<br /> Suniland Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Apphcable)
<br /> 2002 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size. cost, etc.) AND SPECIFIC ROLE
<br />Plumbing Engineer for the design of 10 acres of active park space including the addition of a Community Center. housing a multi-
<br />purpose assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to a
<br />Recreation Center, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot
<br />lot
<br />X Check if Project performed with current firm.
<br />b. (1) TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED
<br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2004
<br /> 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Plumbing Engineer for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF Com-
<br />munity Center consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter for
<br />public gatherings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path
<br />with fitness stations, and parking for 140 vehicles.
<br />X Check if Project performed with current firm.
<br />c. (1) TITLE AND LaCA TION (City and State) (2) YEARS COMPLETED
<br /> Red Road Commons, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If AppliCable)
<br /> 2006 2008
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Plumbing Engineer for a mixed-used development situated on a 6.81-acre parcel, in a prominent site located on Red Road, housing
<br />approximately 250 apartments, a "shell" for a grocery store of 30,000-40,000 SF, and structured parking to accommodate the pro-
<br />posed development The scope of services includes Conceptual Design 1 Zoning Submittals incorporating comments, suggestions and
<br />design modifications to the project. WA provided architectural and engineering services for two parking garages totaling 950 spaces
<br />for a mixed use development housing 405 residential units and several retail facilities.
<br />X Check if Project performed with current firm.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> City Place Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> West Palm Beach, FL 2000 2001
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Plumbing Engineer 4,600 car pre-cast garage supporting the mixed use urban development on 40 acres in West Palm Beach. This
<br />urban redevelopment has revitalized the City and created retail, entertainment, and residential uses around vibrant and active public
<br />spaces.
<br />X Check if Project performed with current firm.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br />Mary Brickell Village and Parking Garage
<br /> Miami. FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2005 2007
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Plumbing Engineer for the integrated mixed-use project, the parking garage at Mary Brickell Village provides 1,400 retail and resi-
<br />dential spaces on 8 floors with specific user zones allocated to 1. The retail component, 2. A 31,000 SF Publix, and 3. 24 floors of
<br />apartments above. In all, the project presents itself as the prototype for mixed use in-town living.
<br />X Check if Project performed with current firm.
<br />
<br />WOLFBERG ALVAREZ AND PARTNERS
<br />PAGE 8
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|