Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12. NAME: 13 ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Sigfredo Casal Cost Estimator <br />Cost Estimator a. TOTAL I b. WITH CURRENT FIRM <br /> 29 29 <br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />BS/1972/Electrical Engineering, City College of New York <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, Ere.) <br />Florida Engineering Society (FES)/llIuminating Engineering Society of North America (IES)/ <br />Institute of Electrical and Electronic Engineers (IEEE) <br /> 19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> Suniland Park, Village of Pinecrest, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If Applicable) <br /> 2002 2003 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Cost Estimator for the design of 10 acres of active park space including the addition of a Community Center. housing a multipur- <br />pose assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to a Rec- <br />reation Center, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot lot. <br />X Check if Proiect performed with current firm. <br />b. (1) TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED <br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2003 2004 <br />(3) BRIEF DESCRIPTION (Brief Scope. size, cost. etc.) AND SPECIFIC ROLE <br />Cost Estimator for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF Community <br />Center consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter for public <br />gatherings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with <br />fitness stations, and parking for 140 vehicles. <br />X Check if Project performed with current firm. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> VA Medical Center and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> West Palm Beach, FL 1992 1994 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Cost Estimator for the design for the 400-bed center (340 medical/surgical beds and 60 psychiatric beds) includes all adjunct supporting <br />facilities including radiology, laboratories, therapy, pharmacies, food service, medical records, storage and administrative offices. Also <br />included are a three-level parking garage, totaling more than 500,000 SF, with space for more than 800 vehicles <br />X Check if Project performed with current firm. <br />d. (1) TITLE AND LOCATION (Cfty and State) (2) YEARS COMPLETED <br /> Sunset Place Retail and Parking Garage Expansion PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> South Miami, FL 1997 1998 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Cost Estimator for the parking garage expansion. The incorporation of arcades, landscaped walks and plazas created an attractive, <br />safe environment for both tourists and locals. WA served as the Architect and Engineer of Record for the redevelopment of a 700,000 <br />SF "urban destination" retail complex. These improvements were coordinated with the City of South Miami and its Hometown Plan. <br />The expansion also included an addition to the existing parking garage to creating a 580.000 SF, eight-level structure for a total of <br />1,700 parking spaces. <br />X Check if Project performed with current firm. <br />e. (1) TITLE AND LOCATION (Cfty and State) (2) YEARS COMPLETED <br />Mary Brickell Village and Parking Garage <br /> Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2005 2007 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Cost Estimator for the integrated mixed-use project, the parking garage at Mary Brickell Village provides 1,400 retail and residen- <br />tial spaces on 8 floors with specific user zones allocated to 1. The retail component, 2. A 31,000 SF Publix, and 3. 24 floors of apart- <br />ments above. In all, the project presents itself as the prototype for mixed use in-town living. <br />X Check if Project performed with current firm. <br /> <br />WOLFBERG ALVAREZ AND PARTNERS <br />PAGE 9 <br /> <br />STANDARD FORM 330 (1/2004) <br />