<br />.
<br />
<br />.
<br />
<br />.
<br />
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Complete one Section E for each key person)
<br />12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jorge Maldonado, PE Civil Engineer
<br />Director of Civil Engineering a, TOTAL I b. WITH CURRENT FIRM
<br /> 20 8.5
<br />16 EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />1997 I Bachelor of Science / Civil Engineering / Florida Interna- Registered Engineer
<br />tional University 1997 / Florida No. 58684
<br />18. OTHER PROFESSIONAL QUALlFICA TIONS (PublicatIOns. Organizations, Traimng. Awards, Ere.)
<br /> 19. RELEVANT PROJECTS
<br />a. (11 TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED
<br /> Village of Palmetto Bay Community Center and Library at Bayside PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Park, Village of Palmetto Bay, FL 2007 2008 est.
<br />(3) BRIEF DESCRIPTION (Brief Scope. size, cost, etc.) AND SPECIFIC ROLE
<br />Civil Engineer for a two-story 9,000 SF Community Center and library, to be located next to an environmentally-oriented park. The Cen-
<br />ter will offer meeting and performance space for events, lectures, and various community activities.
<br />X Check if Project performed with current firm.
<br />b. (1) TITLE AND lOCATION (C;ry and State) (2) YEARS COMPLETED
<br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES CONSTRuCTION (If Applicable)
<br /> 2003 2004
<br />(3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE
<br />Civil Engineer for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF Community Cen-
<br />ter consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter for public gather-
<br />ings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness
<br />stations, and parking for 140 vehicles.
<br />X Check if Project performed with current firm.
<br />c. (1) TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED
<br /> South Pointe Phase" Streetscapes Improvements Program, Miami PROFESSIONAL SERVICES CONSTRUCTION (II ApplIcable)
<br /> 2007
<br /> Beach, FL
<br />Civil Engineer to the South Pointe Phase II project. Scope of services includes Planning, Preparation of Construction Documents under
<br />Design Services, Bidding and Award services, and Construction Administration services.
<br />X Check if Project performed with current firm.
<br />d (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> NASA, Operations & Support Building II, Kennedy Space Center, FL PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br />Civil Engineering design for a new operations and support complex located at the Kennedy Space Center. Services provided included:
<br />demolition plans, water and sewer main extensions design. lift station and force main design, chilled water lines design, paving, grading
<br />and drainage, stormwater pOllution prevention plans, and permit application.
<br />X Check if Project performed with current firm.
<br />e (1) TITLE AND LOCATION (City and State) (21 YEARS COMPLETED
<br /> Suniland Park, Village of Pinecrest. FL PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> 2002 2003
<br />Civil Engineer for the design of 10 acres of active park space including the addition of a Community Center, housing a multipurpose
<br />assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to a Recreation Cen-
<br />ter, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot lot.
<br />X Check if Project performed with current firm.
<br />
<br />WOLFBERG ALVAREZ AND PARTNERS
<br />PAGE10
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|