Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jorge Maldonado, PE Civil Engineer <br />Director of Civil Engineering a, TOTAL I b. WITH CURRENT FIRM <br /> 20 8.5 <br />16 EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />1997 I Bachelor of Science / Civil Engineering / Florida Interna- Registered Engineer <br />tional University 1997 / Florida No. 58684 <br />18. OTHER PROFESSIONAL QUALlFICA TIONS (PublicatIOns. Organizations, Traimng. Awards, Ere.) <br /> 19. RELEVANT PROJECTS <br />a. (11 TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED <br /> Village of Palmetto Bay Community Center and Library at Bayside PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Park, Village of Palmetto Bay, FL 2007 2008 est. <br />(3) BRIEF DESCRIPTION (Brief Scope. size, cost, etc.) AND SPECIFIC ROLE <br />Civil Engineer for a two-story 9,000 SF Community Center and library, to be located next to an environmentally-oriented park. The Cen- <br />ter will offer meeting and performance space for events, lectures, and various community activities. <br />X Check if Project performed with current firm. <br />b. (1) TITLE AND lOCATION (C;ry and State) (2) YEARS COMPLETED <br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES CONSTRuCTION (If Applicable) <br /> 2003 2004 <br />(3) BRIEF DESCRIPTION (Brief Scope, size. cost. etc.) AND SPECIFIC ROLE <br />Civil Engineer for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF Community Cen- <br />ter consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter for public gather- <br />ings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness <br />stations, and parking for 140 vehicles. <br />X Check if Project performed with current firm. <br />c. (1) TITLE AND LOCATION (Cdy and State) (2) YEARS COMPLETED <br /> South Pointe Phase" Streetscapes Improvements Program, Miami PROFESSIONAL SERVICES CONSTRUCTION (II ApplIcable) <br /> 2007 <br /> Beach, FL <br />Civil Engineer to the South Pointe Phase II project. Scope of services includes Planning, Preparation of Construction Documents under <br />Design Services, Bidding and Award services, and Construction Administration services. <br />X Check if Project performed with current firm. <br />d (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> NASA, Operations & Support Building II, Kennedy Space Center, FL PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br />Civil Engineering design for a new operations and support complex located at the Kennedy Space Center. Services provided included: <br />demolition plans, water and sewer main extensions design. lift station and force main design, chilled water lines design, paving, grading <br />and drainage, stormwater pOllution prevention plans, and permit application. <br />X Check if Project performed with current firm. <br />e (1) TITLE AND LOCATION (City and State) (21 YEARS COMPLETED <br /> Suniland Park, Village of Pinecrest. FL PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> 2002 2003 <br />Civil Engineer for the design of 10 acres of active park space including the addition of a Community Center, housing a multipurpose <br />assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to a Recreation Cen- <br />ter, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot lot. <br />X Check if Project performed with current firm. <br /> <br />WOLFBERG ALVAREZ AND PARTNERS <br />PAGE10 <br /> <br />STANDARD FORM 330 (1/2004) <br />