My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partnerss
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Wolfberg Alvarez & Partnerss
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/28/2008 11:40:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by tile agency, or 10 projects, if not specified. <br />Complete one Section F for eacil project.) <br /> <br />CC. EXAMPLE PROJECT KEY NUMBER: 9 <br /> <br />DD. TITLE AND LOCATION (City and State): CITY OF MIAMI PARKING GARAGE NO.1, MIAMI, FLORIDA <br /> <br />EE. YEAR COMPLETED - PROFESSIONAL SERVICES: 2007 <br /> <br />FF. YEAR COMPLETED. CONSTRUCTION (If applicable): N.A. <br />23a. PROJECT OWNER'S INFORMATION - PROJECT OWNER: MIAMI DOWNTOWN DEVELOPERS, LLC <br />23b. PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: MR. KRIS BAUMAN <br /> <br />23c. PROJECT OWNER'S INFORMATION. POINT OF CONTACT TELEPHONE NUMBER: N.A. <br /> <br />BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): Tile proposed <br />development will consist of an L-shaped structure and cover an area of about 290 by 295 feet in plan view. Tile <br />bottom 11-levels of the entire development will be used for parking and office components; from this pedestal <br />another 33-level structure will rise to a total building height of about 41-levels. The 41-level tower structure will <br />be located in the northern and eastern portion of the site. The proposed structure will rise from the existing site <br />grade, no basement areas are planned. The site is bounded by North Miami Ave to the east, NW 3,d Street to the <br />north and NW 2nd Street to the south. Tile purpose of our services on tllis project was to explore the subsurface <br />conditions in order to provide recommendations for foundation design and construction. <br /> <br />31. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (6/2004) PAGE 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.