Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />President <br /> <br />12. NAME <br />Linda M. Bell, P.E. <br /> <br />a. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />23 <br /> <br />11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BSCE, University of Miami, Civil Engineering, 1981 Professional Engineer - Civil Engineer - 1987 <br />AA, Miami-Dade College, Architecture Florida Registration # PE 38542 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />More than twenty-three years of civil engineering experience in the planning, design and construction of <br />civil eng. projects. 1997 Engineer of the Year-Florida Engineering Society, Miami Chapter. <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (ei/yand State) (2) YEAR COMPLETED <br /> Grand A venue Roadway Improvements, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2003 2005 <br /> (3) BRIEF DESCRIPTION (Briet scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. After Master Plan and Public Meetings, CWI designed these roadway improvements for Miami-Dade Public Works which <br /> was constructed by the City of Miami. This project included the reconstruction of a four-lane undivided roadway down to a <br /> two-lane divided roadway section with landscaped median and parking on each side. The project design included wider <br /> sidewalks, decorative lighting, new drainage, and many neighborhood public involvement meetings. <br /> ~ . r'"r" <l:A ~:JI:,,~ -'. 0"',,, D~,,:"n' . P, D""r1..."" n~~:__ <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Aquatic Complex - Parking Lot Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> City of Coral Springs, Florida 2005 2005 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Civil Works provided the design of a new parking lot for the City of Coral Springs. The parking area, approximately 800 feet <br /> by 105 feet, included improvements of asphalt concrete driving aisles with grassed parking spaces and pavement markings. <br /> Parking lot lighting was also designed. Construction Cost: $970,000 Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FlU Parking Garage 4 and Signal & Roadway PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Improvements 2003 2004 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Design and permitting for a new signalized intersection at SW 8th St (SR90) and SW I 09th Ave to provide access to the new <br /> Parking Garage 4 at FlU. The project included a driveway design for a new entrance, signal design to replace the existing T- <br /> intersection signal, roadway improvements to modify an existing median to create a left turn bay from SW 8th St and signing <br /> and pavement marking plans. Construction Cost: $250,000 Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> N. W. 102 Road / Town of Medley, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2006 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. This project included Design, Contract Document Production, and Construction Administration of Drainage Improvements, <br /> Milling, Resurfacing, and Striping for a three lane undivided urban roadway. Due to the truck traffic and large quantity of <br /> fines generated by the concrete plant located on this roadway, an exfiltration drainage system with sediment collection <br /> structures was design for this roadway. Construction Administration included shop drawing review, response to RFI's, daily <br /> field observations, review of pay requests, punch-list generation and verification, as well as certification for permit close-out. <br /> Construction Cost: $400,000 Soecific Role: Proiect Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SFWMD - General Engineering Consultant PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 1998-2002 1998-2002 <br />e. <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> This General Contract includes engineering services for projects in ] 1 counties, general civil, environmental, canal bank <br /> stabilization, Master Planning, structural and various other services. Project Fees: $395,000 Specific Role: Proj. Eng.lPM <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />