<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com fete one Section E for each ke erson.
<br />13. ROLE IN THIS CONTRACT
<br />Project Manager
<br />President
<br />
<br />12. NAME
<br />Linda M. Bell, P.E.
<br />
<br />a. TOTAL
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />
<br />23
<br />
<br />11
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />BSCE, University of Miami, Civil Engineering, 1981 Professional Engineer - Civil Engineer - 1987
<br />AA, Miami-Dade College, Architecture Florida Registration # PE 38542
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />More than twenty-three years of civil engineering experience in the planning, design and construction of
<br />civil eng. projects. 1997 Engineer of the Year-Florida Engineering Society, Miami Chapter.
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (ei/yand State) (2) YEAR COMPLETED
<br /> Grand A venue Roadway Improvements, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2003 2005
<br /> (3) BRIEF DESCRIPTION (Briet scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />a. After Master Plan and Public Meetings, CWI designed these roadway improvements for Miami-Dade Public Works which
<br /> was constructed by the City of Miami. This project included the reconstruction of a four-lane undivided roadway down to a
<br /> two-lane divided roadway section with landscaped median and parking on each side. The project design included wider
<br /> sidewalks, decorative lighting, new drainage, and many neighborhood public involvement meetings.
<br /> ~ . r'"r" <l:A ~:JI:,,~ -'. 0"',,, D~,,:"n' . P, D""r1..."" n~~:__
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Aquatic Complex - Parking Lot Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> City of Coral Springs, Florida 2005 2005
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Civil Works provided the design of a new parking lot for the City of Coral Springs. The parking area, approximately 800 feet
<br /> by 105 feet, included improvements of asphalt concrete driving aisles with grassed parking spaces and pavement markings.
<br /> Parking lot lighting was also designed. Construction Cost: $970,000 Specific Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FlU Parking Garage 4 and Signal & Roadway PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Improvements 2003 2004
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Design and permitting for a new signalized intersection at SW 8th St (SR90) and SW I 09th Ave to provide access to the new
<br /> Parking Garage 4 at FlU. The project included a driveway design for a new entrance, signal design to replace the existing T-
<br /> intersection signal, roadway improvements to modify an existing median to create a left turn bay from SW 8th St and signing
<br /> and pavement marking plans. Construction Cost: $250,000 Specific Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> N. W. 102 Road / Town of Medley, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2006 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. This project included Design, Contract Document Production, and Construction Administration of Drainage Improvements,
<br /> Milling, Resurfacing, and Striping for a three lane undivided urban roadway. Due to the truck traffic and large quantity of
<br /> fines generated by the concrete plant located on this roadway, an exfiltration drainage system with sediment collection
<br /> structures was design for this roadway. Construction Administration included shop drawing review, response to RFI's, daily
<br /> field observations, review of pay requests, punch-list generation and verification, as well as certification for permit close-out.
<br /> Construction Cost: $400,000 Soecific Role: Proiect Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SFWMD - General Engineering Consultant PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 1998-2002 1998-2002
<br />e.
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> This General Contract includes engineering services for projects in ] 1 counties, general civil, environmental, canal bank
<br /> stabilization, Master Planning, structural and various other services. Project Fees: $395,000 Specific Role: Proj. Eng.lPM
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2