Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br />Traffic Engineer <br />Vice President <br /> <br /> <br />14. YEARS EXPERIENCE <br />. WITH CURRENT FIRM <br /> <br />James Gran, P .E. <br /> <br />a. TOTAL <br /> <br />24 <br /> <br />11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BSCE, University of Miami 1982- Civil Engineering Professional Engineer - Civil Engineer--1988 <br />Traffic Operation Studies-Northwestern Univ. Traffic Florida Registration # PE 41917 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />More than 24 years of civil engineering experience in the planning, design and construction inspection of projects. Mr. <br />Gran has training in CPTED to reduce crime by increased surveillance, access control and territorial defensive tactics. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Dade College Traffic Study and SR-874 Roadway PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2006 NA <br /> Improvements, Miami, Florida <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> This project included a Traffic Study for the MDC Kendall Campus and included an evaluation of operational improvements <br /> along Killian Parkway and at the revised SR 874/Killian Interchange. CWI collected traffic data and analyzed the campus <br /> circulation patterns and campus access. The project also included design of the traffic signal improvements for the Killian <br /> Parkway Intersection with SW lOth Ave and SR 874 interchange. Project Cost: NA Specific Role: Project <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FlU North Campus Traffic Study, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2002 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />b. CWl prepared a Traffic Study for the intersection of NE 145'h Street and University Drive on the FlU North Campus and <br /> included a field review of existing site conditions, traffic counts, and an operational and accident analysis of the existing <br /> intersection. Four improvement scenarios for the intersection with preliminary cost estimates, sketches of the recommended <br /> improvements and a Level of Service analysis for each recommended improvements were presented to the university. <br /> Const. Cost: NA Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FlU Parking Garage 4 and Roadway Impr. - Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2003 2004 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />C. <br /> Project Manager responsible for the design and plans production for the signalized intersection at SW 109 Ave. and Tamiami <br /> Trail (SR-80) to accommodate the traffic for a new parking garage at FlU, South Campus. Plans included modifying the <br /> existing "T" signalized intersection into a four-way, widening of SR-80, adding a four-lane divided section connector to SR- <br /> 80, striping, temporary driveway access, and Maintenance of Traffic. Cost: $250,000 Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> 137th Street AutoPark Traffic Impact Study - Miami, FL PROFESSIONAL SERVICES ONSTRUCTION (If applicable) <br /> 2001 N/A <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> The purpose of this study was to estimate the traffic impacts of the Auto Park development on the adjacent arterial roadways <br /> (SW ] 37'h Ave. and SW 13th St.). In particular this analysis was performed to compare the traffic that will be generated by <br /> the proposed Auto Park to the traffic that would have been generated by the currently approved site plans within the same <br /> project limits. Construction Cost for Roadway Improvements: $200,000 Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kendall Drive Master Plan - Miami-Dade, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2002 N/A <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Performing a street closure study for the City of Miami Beach on three proposed street closures south of Normandy Drive. <br /> This study provided the impacts of the proposed street closures and made recommendations for improvements to off-set the <br /> impacts of the closures. Construction Cost for Roadway Improvements: $100,000 Specific Role: Project Manager <br /> <br />STANDARD FOR M 330 (1/2004) PAGE 2 <br />