Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com tete one Section E for each ke <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> <br />b. WITH CURRENT FIRM <br /> <br />Vaughn Soares, P.E. <br /> <br />Quality Control <br /> <br />14 <br /> <br />9 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Civil Eng. / Florida International University Professional Engineer - Civil Engineer <br />Florida Registration # PE 56912-2001 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As the Director of Civil Works, Inc., Mr. Soares has more than fourteen years of civil and environmental engineering experience in <br />the design and preparation of engineering projects including roadways, drainage, airports, water and sewer, commercial parking <br />lots, signalized intersections and transit rail stations. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FlU Parking Garage 4 and Roadway Impr., Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2003 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />a. Project Manager responsible for the design and plans production for the signalized intersection at SW 109 Ave. and Tamiami <br /> Trail (SR-80) to accommodate the traffic for a new parking garage at flU, South Campus. Plans included modifying the <br /> existing ''T'' signalized intersection into a four-way, widening of SR-80, adding a four-lane divided section connector to SR- <br /> 80, striping, temporary driveway access, and Maintenance of Traffic. <br /> Cost: $250,000 Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> DERM-Belen Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2005 2004-2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />b. PM responsible for design, coordination, estimating, scheduling and preparation of a stomlwater system for the 1.5 square <br /> mile Belen Drainage Basin. Modeling included pre and post simulations of 5-yr/24-hr, 10-yr/24-hr, 25-yr/3-day, and 100- <br /> yr/3-day storm events. This Project included the design and construction observation of drainage improvements for a I Y2 <br /> square mile area funded by Miami-Dade County and FEMA; 23 drainage basins, approx. one mile of ex filtration trench, <br /> conveyance piping, two large storm water pump stations operating in parallel and two emergency overflows to the adjacent C- <br /> 4 canal. Construction Cost: $17 million Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ives Estates Youth Complex Phase I - Miami-Dade Parks PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> and Recreation, Florida 2003-2006 2007 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Master Planning and design of const. documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex Project <br /> included a lighted parking lot, a lighted soccer field, two lighted ball fields, recreation center and maintenance building, water, <br /> sanitary lift station, electrical and communication infrastructure. Const. Cost: $3.5 million Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ft. Lauderdale Airport Rescue & Fire Station #10 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2002 2002 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> This project included the design and preparation of construction plans for a new fire station to be built in the middle of the <br /> airfield between the two runways. This project included the civil engineering design for the paving, grading, drainage, water, <br /> sewer, and site lighting. Construction Cost: $1.4 million Specific Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coral Springs Aquatic Complex PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2005 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ere.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Civil Works provided the design of a new parking lot for the City of Coral Springs. The parking area, approximately 800 feet <br /> by 105 feet, included improvements of asphalt concrete driving aisles with grassed parking spaces and pavement markings. <br /> Parking lot lighting was also designed. Construction Cost: $970,000 Specific Role: Design Engineer <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />