|
<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />12. NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com tete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />
<br />b. WITH CURRENT FIRM
<br />
<br />Vaughn Soares, P.E.
<br />
<br />Quality Control
<br />
<br />14
<br />
<br />9
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Civil Eng. / Florida International University Professional Engineer - Civil Engineer
<br />Florida Registration # PE 56912-2001
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />As the Director of Civil Works, Inc., Mr. Soares has more than fourteen years of civil and environmental engineering experience in
<br />the design and preparation of engineering projects including roadways, drainage, airports, water and sewer, commercial parking
<br />lots, signalized intersections and transit rail stations.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FlU Parking Garage 4 and Roadway Impr., Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2003 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />a. Project Manager responsible for the design and plans production for the signalized intersection at SW 109 Ave. and Tamiami
<br /> Trail (SR-80) to accommodate the traffic for a new parking garage at flU, South Campus. Plans included modifying the
<br /> existing ''T'' signalized intersection into a four-way, widening of SR-80, adding a four-lane divided section connector to SR-
<br /> 80, striping, temporary driveway access, and Maintenance of Traffic.
<br /> Cost: $250,000 Specific Role: Project Engineer
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> DERM-Belen Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2005 2004-2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />b. PM responsible for design, coordination, estimating, scheduling and preparation of a stomlwater system for the 1.5 square
<br /> mile Belen Drainage Basin. Modeling included pre and post simulations of 5-yr/24-hr, 10-yr/24-hr, 25-yr/3-day, and 100-
<br /> yr/3-day storm events. This Project included the design and construction observation of drainage improvements for a I Y2
<br /> square mile area funded by Miami-Dade County and FEMA; 23 drainage basins, approx. one mile of ex filtration trench,
<br /> conveyance piping, two large storm water pump stations operating in parallel and two emergency overflows to the adjacent C-
<br /> 4 canal. Construction Cost: $17 million Specific Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Ives Estates Youth Complex Phase I - Miami-Dade Parks PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> and Recreation, Florida 2003-2006 2007
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Master Planning and design of const. documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex Project
<br /> included a lighted parking lot, a lighted soccer field, two lighted ball fields, recreation center and maintenance building, water,
<br /> sanitary lift station, electrical and communication infrastructure. Const. Cost: $3.5 million Specific Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Ft. Lauderdale Airport Rescue & Fire Station #10 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2002 2002
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br /> This project included the design and preparation of construction plans for a new fire station to be built in the middle of the
<br /> airfield between the two runways. This project included the civil engineering design for the paving, grading, drainage, water,
<br /> sewer, and site lighting. Construction Cost: $1.4 million Specific Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Coral Springs Aquatic Complex PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2005 2005
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ere.) AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Civil Works provided the design of a new parking lot for the City of Coral Springs. The parking area, approximately 800 feet
<br /> by 105 feet, included improvements of asphalt concrete driving aisles with grassed parking spaces and pavement markings.
<br /> Parking lot lighting was also designed. Construction Cost: $970,000 Specific Role: Design Engineer
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|