My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partnerss
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Wolfberg Alvarez & Partnerss
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/28/2008 11:40:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-- <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke erson. <br /> <br />12. NAME <br />Jose M. Aldir, E.!. <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />. TOTAL <br /> <br />10 <br /> <br />7 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />BS in Geological Eng. - Colorado School of Mines Engineering Intern <br />AA - Miami Dade Community College <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Aldir has more than 10 years of engineering and geotechnical experience in the United States and Latin America. He has <br />prepared studies. conducted field investigations. construction plans and field observation. His geotechnical experience assists in <br />the knowledge of roadway and utility design and preparation of construction documents. He has been responsible for design and <br />plan reviews in the following categories: water & sewer. drainage, roadway. traffic signals. and paving and grading designs. <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FlU Parking Garage 4 and Roadway Impr., Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> 2003 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. Project Engineer responsible for the design and plans production for the signalized intersection at SW ] 09 Ave. and <br /> Tamiami Trail (SR-80) to accommodate the traffic for a new parking garage at FlU. South Campus. Plans included <br /> modifying the existing HT" signalized intersection into a four-way, widening of SR-80. adding a four-lane divided section <br /> connector to SR-80. striping. temporary driveway access. and Maintenance of Traffic. <br /> Cost: $250,000Specific Role: Project Eng. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coral Springs Aquatic Complex - Parking Lot PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> Improvements 2005 2005 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Civil Works provided the design of a new parking lot for the City of Coral Springs. The parking area, approximately 800 <br /> feet by l05 feet. included improvements of asphalt concrete driving aisles with grassed parking spaces and pavement <br /> markings. Parking lot lighting was also designed. Construction Cost: $970,000 Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR AlA (MacArthur Causeway) from Watson Island to PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> Terminal Island 2005 N/A <br />C. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> This milling and resurfacing and rehabilitation project included the modification of an existing signal at the Terminal Island <br /> intersection. <br /> Construction Cost: $2.2 million Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 976 (Bird Road/SW 40th Street) from SW 38th PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br />d. Avenue to SR 5 (US-I) 2002 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed With current firm <br /> This project included roadway milling and resurfacing improvements and the upgrading of a span wire traffic signal to a <br /> mast arm traffic signal at SW 37'h Avenue. Construction Cost: $1.0 million Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 5 (Biscayne Blvd) from NE 209th Street to the Broward PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> County Line 2003 2004 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check If project performed with current firm <br /> This milling and resurfacing project included the addition of Bike Lanes from NE 209th Street to the Miami-DadelBroward <br /> County Line. The upgrading of a span wire traffic signal to mast arms at NE 209'h Street was also included in this project. <br /> Construction Cost: $645,000 Specific Role: Project Engineer <br /> <br />STANDARD FORM 330 (112004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.