My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partnerss
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Wolfberg Alvarez & Partnerss
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/28/2008 11:40:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke erson. <br /> <br />12. NAME <br />Gustavo Eckardt, E.I. <br /> <br /> <br />14. YEARS EXPERIENCE <br /> <br />b. WITH CURRENT FIRM <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br />a. TOTAL <br /> <br />5 <br /> <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />B.S. Civil Engineering/ Engineering Intern <br />University of North Carolina at Charlotte <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Eckardt has 5 years of engineering experience in the field of civil and environmental engineering in the design and <br />preparation of projects including stormwater drainage, drainage, roadway and transit rail station projects. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> !Yes Estates Park Youth Complex - Miami-Dade Park and PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> Recreation Department, Florida 2003-2006 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check If project performed with current firm <br /> Master Planning and design of construction documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex <br /> Project included a lighted parking lot, a lighted soccer field, two lighted ball fields, a recreation center and a maintenance <br /> building, water, sanitary lift station, electrical and communication infrastructure. Permitting and coordination with Solid <br /> Waste. DERM. and FDEP due to site conditions. Construction Cost: $3.5 million Soecific Role: Const. Admin. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belen Drainage Improvements - DERM PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> 2005 2004-2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if projecf performed with current firm <br /> Project Engineer for the design and preparation of plans for a 250 acre drainage basin included ] 9 sub-basins. with catch <br /> basins, French drains, a conveyance system, two large 100+ Hp pump stations, two connections to the Tamiami Canal in the <br /> Belen area of Miami-Dade County. Construction Cost: $17 million Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Village of Palmetto Bay Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 2005 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Project Engineer responsible for the Drainage Analysis and Design for a number of local residential roadways in the Village <br /> of Palmetto Bay that had a history of recurring ponding problems. Plans included: Roadway Drainage, Traffic Control and <br /> Signing and Marking. Construction Cost: $2.5 million Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade Transit Busway Extension to Florida City and PROFESSIONAL SERVICES CONSTRUCTION (If <br /> applicable) <br /> US-} Reconstruction 2005 2005 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Construction of I 1.5 miles of new roadway to be used as exclusive bus lanes with state-of-the-art passenger stations, <br /> bikepath, and bridges; and the urban reconstruction of adjacent US- J conidor, including roadway widening. asphalt milling. <br /> new drainage, sidewalks, bridge widening, street lighting, new traffic signals, signing and markings. Responsible for field <br /> observation and quality control of the installation of street lighting and signalization components for Segment ] N0l1h as <br /> well as the compilation of the project changes in the As-Built set. Const. Cost: $6.0 million Specific Role: Project Eng. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami - 8" Water Main Replacement PROFESSIONAL SERVICES \CONSTRUCTION (If <br /> applicable) <br /> 2007 Est. 2009 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed With current firm <br /> This project included design of more than 6400 linear feet of an 8-inch water main to be constructed as part of a <br /> neighborhood improvement program. Design included documentation of existing utilities and public involvement. <br /> Construction Cost: Under Design Specific Role: Project Engineer <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.