Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke erson. <br /> <br />12. NAME <br />Mike MacDonell <br /> <br />13. ROLE IN THIS CONTRACT <br />Construction Administration a. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />20 <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Associates in Art - Miami-Dade College Certified General Contractor - License No. 1513064 <br />Certified Work site Traffic Supervisor <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. MacDonell has over twenty years of experience in the construction field. During this time he has worked on a <br />number of Roadway, Water, Sewer, Drainage and Civil Engineering projects for the public sector. <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ives Estates Park Youth Complex - Miami-Dade Park and PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> Recreation Department, Florida 2003-2006 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br /> Master Planning and design of construction documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex <br /> Project included a lighted parking lot, a lighted soccer field, two lighted ball fields, a recreation center and a maintenance <br /> building, water. sanitary lift station, electrical and communication infrastructure. Permitting and coordination with Solid <br /> Waste, DERM. and FDEP due to site conditions. Construction Cost: $3.5 million Snecific Role: Const. Admin. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 102nd Road, Town of Medley, Florida PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 2006 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> This project included Design, Contract Document Production, and Construction Administration of Drainage Improvements, <br /> Milling. Resurfacing, and Striping for a three lane undivided urban roadway. Construction Administration included shop <br /> drawing review, response to RFI's, daily field observations, review of pay requests, punch-list generation and verification. as <br /> well as certification for permit close-out. Construction Cost: $400,000 Specific Role: Construction Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Bay Roadway Improvements PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 2005 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed With current firm <br /> Construction Manager responsible for the Drainage Analysis and Design for a number of local residential roadways in the <br /> Village of Palmetto Bay that had a history of recurring ponding problems. Plans included: Roadway Drainage, Traffic <br /> Control and Signing and Marking. Construction Cost: $2.5 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> US-27 (Okeechobee Road) from W 18th A venue to W 12th PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br />d. A venue, Miami-Dade County 2004 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> This project added lanes and reconstructed 1.928 km of roadway including Bulkhead Road with decorative planters on canal <br /> and landscaping features. Construction Cost: $11 million Specific Role: Construction Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Expressway (SR826) from NW 62nd Street to NW PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 103rd Street, Miami-Dade County 2004 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Add lanes and reconstruct 2.959 km of 8-1ane divided highway. Construct seven new bridges included Curved Steel Girder <br /> Flyover, widen four bridges over Metrorail and FEC Roadway, MSE Walls. Steel Sheet Piling and Concrete Retaining <br /> Walls. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />