|
<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com Jete one Section E for each ke erson.
<br />
<br />12. NAME
<br />Mike MacDonell
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Construction Administration a. TOTAL
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />
<br />20
<br />
<br />2
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Civil Works, Inc. 10 NW 42nd Ave, Suite 200, Miami, Florida 33126
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Associates in Art - Miami-Dade College Certified General Contractor - License No. 1513064
<br />Certified Work site Traffic Supervisor
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. MacDonell has over twenty years of experience in the construction field. During this time he has worked on a
<br />number of Roadway, Water, Sewer, Drainage and Civil Engineering projects for the public sector.
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Ives Estates Park Youth Complex - Miami-Dade Park and PROFESSIONAL SERVICES CONSTRUCTION (II
<br /> applicable)
<br /> Recreation Department, Florida 2003-2006 2007
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Master Planning and design of construction documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex
<br /> Project included a lighted parking lot, a lighted soccer field, two lighted ball fields, a recreation center and a maintenance
<br /> building, water. sanitary lift station, electrical and communication infrastructure. Permitting and coordination with Solid
<br /> Waste, DERM. and FDEP due to site conditions. Construction Cost: $3.5 million Snecific Role: Const. Admin.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 102nd Road, Town of Medley, Florida PROFESSIONAL SERVICES CONSTRUCTION (II
<br /> applicable)
<br /> 2006 2007
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> This project included Design, Contract Document Production, and Construction Administration of Drainage Improvements,
<br /> Milling. Resurfacing, and Striping for a three lane undivided urban roadway. Construction Administration included shop
<br /> drawing review, response to RFI's, daily field observations, review of pay requests, punch-list generation and verification. as
<br /> well as certification for permit close-out. Construction Cost: $400,000 Specific Role: Construction Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Palmetto Bay Roadway Improvements PROFESSIONAL SERVICES CONSTRUCTION (II
<br /> applicable)
<br /> 2005 2006
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed With current firm
<br /> Construction Manager responsible for the Drainage Analysis and Design for a number of local residential roadways in the
<br /> Village of Palmetto Bay that had a history of recurring ponding problems. Plans included: Roadway Drainage, Traffic
<br /> Control and Signing and Marking. Construction Cost: $2.5 million
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> US-27 (Okeechobee Road) from W 18th A venue to W 12th PROFESSIONAL SERVICES CONSTRUCTION (II
<br /> applicable)
<br />d. A venue, Miami-Dade County 2004 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br /> This project added lanes and reconstructed 1.928 km of roadway including Bulkhead Road with decorative planters on canal
<br /> and landscaping features. Construction Cost: $11 million Specific Role: Construction Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Palmetto Expressway (SR826) from NW 62nd Street to NW PROFESSIONAL SERVICES CONSTRUCTION (II
<br /> applicable)
<br /> 103rd Street, Miami-Dade County 2004 2005
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br /> Add lanes and reconstruct 2.959 km of 8-1ane divided highway. Construct seven new bridges included Curved Steel Girder
<br /> Flyover, widen four bridges over Metrorail and FEC Roadway, MSE Walls. Steel Sheet Piling and Concrete Retaining
<br /> Walls.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|