Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br /> <br />12. NAME <br />Ahmad Aljbour <br /> <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br />. TOTAL <br /> <br />3 <br /> <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Civil Works, Inc. 10 NW 42"d Ave, Suite 200, Miami, Florida 33126 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Electrical Engineering/ <br />Florida International University <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Mr. Aljbour has three years of engineering experience in the design and preparation of construction documents <br />including water main extensions, force mains, stormwater drainage, paving and grading. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ives Estates Park Youth Complex - Miami-Dade Park and PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> Recreation Department, Florida 2003.2006 2007 <br />a. (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE ! Check if project performed with current firm <br /> Master Planning and design of construction documents for a 94 Acre North Dade Park. The Ives Estates Youth Complex <br /> Project included a lighted parking lot, a lighted soccer field, two lighted ball fields. a recreation center and a maintenance <br /> building, water, sanitary lift station, electrical and communication infrastructure. Permitting and coordination with Solid <br /> Waste. DERM. and FDEP due to site conditions. Construction Cost: '1;3.5 million Soecific Role: Const. Admin. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 5 (Biscayne Blvd) from NE 209th Street to the Broward PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> County Line 2003 2004 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ! Check if project performed with current firm <br /> This milling and resurfacing project included the addition of Bike Lanes from NE ::W9,h Street to the Miami-Dade/Broward <br /> County Line. The upgrading of a span wire traffic signal to mast arms at NE 209th Street was also included in this project. <br /> Construction Cost: $645,000 Soecific Role: Proiect Enl!ineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Grand A venue Roadway Improvements - Miami, Florida PROFESSIONAL SERVICES ~ONSTRUCTION (II <br /> applicable) <br /> 2003 2005 <br />c. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc.) AND SPECIFIC ROLE ! Check If project performed with current firm <br /> After Public Meetings. CWI designed these roadway improvements for MDPW which was constructed by the City of Miami. <br /> This project included the reconstruction of a four-lane undivided roadway down to a two-lane divided roadway section with <br /> landscaped median and parking on each side. The project design included wider sidewalks, decorative lighting, new <br /> draiml!:!e, and many neighborhood meetings. Project Cost: $4Million Specific Role: Const. Admin. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Bay Roadway Improvements PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 2005 2006 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ! Check if project performed with current firm <br /> Project Engineer responsible for the Drainage Analysis and Design for a number of local residential roadways in the <br /> Village of Palmetto Bay that had a history of recurring ponding problems. Plans included: Roadway Drainage. Traffic <br /> Control and Signing and Marking. Construction Cost: $2.5 million Specific Role: Project Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami - 8" Water Main Replacement PROFESSIONAL SERVICES CONSTRUCTION (II <br /> applicable) <br /> 2007 Est. 2009 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ! Check if project performed with current firm <br /> This project included design of more than 6400 linear feet of an 8-inch water main to be constructed as part of a <br /> neighborhood improvement program. Design included documentation of existing utilities and public involvement. <br /> Construction Cost: Under Desilm Specific Role: Proiect Enl!ineer <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />