My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McLeod Architectural Group, P.A.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
McLeod Architectural Group, P.A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/29/2008 12:09:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 2 <br />. 7. JOHN ALDEN CORPORATE CENTER AND PARKING GARAGE <br /> Miami, Florida <br /> Twin Office Towers each with 3.Levef 570-Car Garage, built using pre- <br /> cast concrete framing system, completed 1995. <br /> Approximate cost $16 million. <br /> Owner, John Alden Group <br /> 8. UNIVERSAL CITY SOUTH PARKING STRUCTURE <br /> Orlando, Florida <br /> Design of temporary bracing system for 6-Level Pre-Cast Concrete <br /> Garage. completed 1997. <br /> Contractor, Coreslab Structures. <br /> 9. BLOOMINGDALE'S GARAGE AT AVENTURA MALL <br /> Aventura, Florida <br /> Threshold Inspection for 6-Level 2.650-Car Garage built using pre-cast <br /> concrete framing system, completed 1997. <br /> Approximate cost, $15 millton, <br /> Owner, Turnberry Associates <br /> 10. BURDINE'S GARAGE AT AVENTURA MALL <br /> Aventura, Florida <br /> 7-Level1 ,600 Car Garage built using pre-cast concrete framing system, <br />. completed 1999. I <br /> Approximate cost, $11 million. <br /> Owner, Turnberry Associates, <br /> 11. MIZNER GRAND CONDOMINIUM AND GARAGE I <br /> Boca Raton, F!or!da <br /> 2-Level Garage bum using composite prestressed concrete joist framing <br /> system, completed 2000. <br /> Approximate cost, $4 million. <br /> Owner, Boca Developers <br /> 12. EMERALD BAY CONDOMINIUM AND GARAGE <br /> Key Biscayne, Florida <br /> Partial restoration of a 2-Level Post-Tension Garage, under contract. <br /> Approximate Cost 5250.000. I <br /> Owner, Emerald Bay Condominium Association <br /> 13. UNIVERSITY OF MIAMI PAVIA PARKfNG GARAGE <br /> Coral Gables. Florida j , <br /> 4-Level 567 Car Garage using pre-cast concrete framing system, <br /> Completed 2002, Approximate cost 54 Million <br /> Dt:><ojnniQu,iri '-'o"t""'r'+or The ua<-ket' "'o~p-~" . <br /> - _V:::1HIo,..,.l' uu...." 111,.'-'......" J. 'tl 11-":;>>\ IV '~I dillY I <br />. <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.