Laserfiche WebLink
<br />. <br /> <br />15. <br /> <br />16. <br /> <br />Page 3 <br /> <br />14. <br /> <br />UNIVERSITY OF MIAMI PEARSON PARKING STRUCTURE <br />Coral Gables, Florida <br />3-Level 532 Car Garage using pre-cast concrete framing system, <br />Compteted 2002, Approximate cost $4 Million <br />Design/Build Contractor, TIle Haskell Company <br /> <br />SOUTH MIAMI MUNICIPAL PARKING AUTHORITY <br />South Miami, Florida <br />6-Level 430-Car Mixed Use Parking Garage using pre-cast concrete <br />framing system. CurrentlY' undar constfi..lOiiotl, approximate cost $9 iviifiion. <br />Owner, City of South Miami <br /> <br />MUNICIPAL GARAGE #9 <br />Miami, Florida <br />3-Level 350 Car Mixed Use Parking Garage using pre-cast concrete <br />framing system. Completed 2005, approximate cost $5 Million, <br />Design/Build Contractor, Florida lemark Corporation. <br /> <br />17. COURTHOUSE CENTER GARAGE <br />Miami, Florida <br />11-Story 840 Car Mixed Use Parking Garage using P.T. concrete framing <br />system. Beginning construction 2007, approximate cost $30 Million, <br />Owner, Miami Parking Authority. <br /> <br />. <br /> <br />18. UNIVERSITY OF MIAMI MEDICAL STAFF GARAGE & CHILLER PLANT <br />Mi~mi. Frilrirla <br />10-Level 897 Car Mixed Use Parking Garage using pre-cast concrete <br />framing system, Beginning construction 2007. approximate cost $50 <br />Million. <br />Owner, University of Miami <br /> <br />19. AVENTURA MALL PARKING GARAGE <br />Aventura, Florida <br />Threshold I nspection for 4~Level , 1848 Car Garage using P. T. concrete <br />framing system. under construction, approxirnate cost $15 iv1illion. <br />Ovmer, Turnberry Associates <br /> <br />. <br /> <br />I <br /> <br />. <br />~ <br />