Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E lor each ke person <br /> <br />Oscar Rodriguez (Oscar) <br /> <br />I~ <br />Staff Geotechnical Engineer <br /> <br />4 <br /> <br />3 <br /> <br />'F> <br /> <br />t \Il <br /> <br />6MACTEC <br /> <br />engineering and C011slruC1ing a bencr tomorrow <br /> <br />Miami Lakes, Florida <br /> <br />IL <br /> <br />B.S. Civil Engineering, December 2002, Florida International <br />University, Miami, FL <br /> <br />ll.:.t F ,r-:f III !( It I .i[ H/( .... ~,1j r<., fL.- ~t( <br />FOOT Maintenance of Traffic, ACI Field Training Technician, Environmental Protection Stormwater, Erosion, and Sedimentation Control <br />Inspector #3894, A TSSA Florida Intermediate Training, OSHA 1926-21 (b) (2) Crane Safety <br /> <br />19. RELEVANT PROJECTS <br /> <br />Staff Engineer: Florida Department of Transportation Jewfish Creek Bridge, Key Largo - Assisting with <br />geotechnical exploration and involved with the bridge and road construction. Overseeing and training of rock core <br />sampling for over"water drilling. Took part in the collection and classification of rock and soil samples, laboratory <br />testing, and performing FB Deep analysis. Involved with Dry Soil Mixing a new method of soil improvement used in <br />Europe and now for the first time in America. Dry Soil Mixing is a method of using in situ soils to build <br />embankments for roads in marsh environments, without the use of surcharge. In charge of verifying proper <br />installation of soil mixing and subsequent testing and approval of final product, to ensure adherence to normal <br />roadway standards. <br /> <br />Staff Engineer: Florida Department of Transportation Miami Intermodal Center (MIC), Miami, Florida - Performed <br />axial capacity analysis of drilled shafts and driven piles using FB Deep. Conducted utility clearance and <br />coordinated laboratory testing. Classified soil samples collected during the geotechnical exploration and assisted in <br />preparing the Core Boring Sheet. <br /> <br />Staff Engineer: Florida Department of Transportation 5th Street Bridge Replacement - Performed axial capacity <br />analysis of drilled shafts and driven piles using FB Deep. Conducted utility clearance and coordinated laboratory <br />testing. Classified soil samples collected during the geotechnical exploration and assisted in preparing the Core <br />Boring Sheet. <br /> <br />MACTEC Engineering and Consulting, Miami Lakes, FL (2004 - Present) <br />Staff Engineer <br /> <br />· Responsibilities include various inspections such as timber pile, auger cast pile, form work, steel construction, <br />footers, and foundations. <br />· Generating reports, proposals, work orders, and soil classifications. <br /> <br />PCL Civil Constructors, Inc., Dania Beach, FL (2003) <br />Field Engineer <br /> <br />· Performed analysis and design of steel and concrete for augers cast piles, footers, piers and deck for bridges <br />completed on site. <br />· Inspected jobs for structural integrity, checked plans for conformance to applicable codes and prepared daily <br />reports for the main office. <br />· Maintained the quality of work to ensure strict adherence to specific project specifications. <br />· Communicated on a daily basis with city and project inspectors, sub "contractors, and suppliers with regards to <br />project needs. <br />· Researched information and take"offs upon request. <br />· Successfully designed and coordinated MOT responsibilities pertaining to the entire work site. <br />· Managed and coordinated personnel and operational activities involved in all phases of construction projects <br />· Used AutoCad to do analysis for crane work and illustrate on site problems with bridges to communicate with <br />head engineer. <br /> <br />STANDARD FORM 330 (6/2004) <br />