Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />depression along with passive free product skimming in independent wells implemented to address free-floating <br />petroleum product plume. Approximately 6,000 gallons of free product have been recovered (as of 2004). Provided <br />oversight of monitoring and site remediation efforts. Fees: $521,180. Estimated Completion: 12/31/2004. <br /> <br />EHS Compliance Assessor: Avaya, Inc. Environmental, Health & Safety (EH&S) Support Services Worldwide, <br />Locations Worldwide, . Strategic partnership I staff augmentation consulting worldwide, providing environmental, <br />health & safety (EH&S) services and support for one of the nation's largest providers of corporate communication <br />equipment, network cable systems, software systems, and voice I data consultation. Activities include legal I <br />regulatory, training and consulting support, and corporate auditing. Responsible for serving as EHSMS facilitator <br />for Avaya facility in Miami, performing CPE at Miami facility and serving as Technical Resource for issues in CALA <br />region. Fees: $8,000,000. Estimated Completion: 10/31/2006. <br /> <br />Project Manager:Fort Lauderdale-Hollywood International Airport (FLL) Stormwater Management and <br />Engineering Consulting Services and the North Perry Airport (NPA), Florida. Update of Stormwater Pollution <br />Prevention Plan (SWPPP) in accordance with the Environmental Protection Agency (EP A) Phase I and Phase II <br />Federal regulations for industrial activity adopted by the Florida Department of Environmental Protection (FDEP) <br />National Pollutant Discharge Elimination System (NPDES) Stormwater Section and the requirements specified in <br />the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity <br />(MSGP). Conducted the Annual Comprehensive Site Evaluation (ACSE) for the FLL and NPA in accordance with <br />the FDEP NPDES stormwater regulations for industrial activity. Provided professional engineering and <br />environmental management consulting services to BCAD in conjunction with the FDEP NPDES industrial <br />stormwater inspection of FLL and NPA. Conducted voluntary analytical monitoring and reporting of results <br />pertaining to industry specific point source discharges of stormwater runoff from out falls located within FLL. <br /> <br />STANDARD FORM 330 (6/2004) <br />