My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Russell Partnership, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
The Russell Partnership, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:36:31 PM
Creation date
8/29/2008 12:57:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />() <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E lor each ke person <br /> <br />Jonathan Bulley (Jonathan) <br /> <br />Jt, <br />Environmental Engineer <br /> <br />5 <br /> <br />3 <br /> <br />iL <br /> <br />pMACTEC <br /> <br />engineering and constructing 0 be"er tomorrow <br /> <br />Miami, Florida <br /> <br />., <br /> <br />l <br />Master of Environmental Engineering Environmental <br />Engineering, 2004, Florida International University <br />Bachelor of Science Agricultural Science, 1998, University of <br />Science and Technology <br /> <br />.f ,I' )f ~P' " ~ <br />OSHA 40-hour HAZWOPER Hazardous Materials; OSHA 8-hour Refresher Hazardous Materials <br /> <br />19. RELEVANT PROJECTS <br /> <br />Staff Engineer: Chevron Corporation Paramaribo (Suriname) Site Remediation, Paramaribo. Site remediation <br />including removal and destruction of dissolved petroleum hydrocarbons at a retail service station on a 3/4-acre site. <br />Involved soil vapor extraction (SVE) and treatment of extracted vapors by catalytic oxidation, removing over 3 <br />gallons of petroleum per day (through SVE). Work included submitting weekly remedial progress updates to client, <br />semi-annual groundwater sampling and reporting, negotiations with local regulators and managing client risk. <br />Responsible for soil and groundwater sampling, collection of field data, summary data preparation and analysis of <br />field and laboratory results, technical report writing, soil vapor extraction system evaluation, operations and <br />maintenance. Fees: $120,000. Estimated Completion: 12/1/2005. <br /> <br />Staff Engineer: DME Corporation Commercial Site Groundwater Remediation Design, Development, O&M, Fort <br />Lauderdale, Florida. Performed site remediation, involving removal and destruction of dissolved chlorinated <br />hydrocarbons by the groundwater pump and treat technique and treatment of pumped groundwater by air stripping, <br />for a 3-acre site. RAP compared remedial design alternatives and site constraints and provided customer with most <br />cost effective and timely design. Lowered contaminant levels by three orders of magnitude from system startup. <br />Services included quarterly and annual groundwater sampling and reporting; negotiations with local regulators and <br />managing client risk; and system O&M I optimization. Responsible for performing sampling of groundwater; <br />collected field data, prepared and summarized data, analyzed field and laboratory results, and wrote technical <br />report. Fees: $50,000. Estimated Completion: 12/1/2005. <br /> <br />Staff Engineer: Chevron Corporation Tutu, St. Thomas Site Remediation, Tutu, St. Thomas, Virgin Islands. Site <br />remediation involving removal and destruction of dissolved petroleum hydrocarbons by SVEIDPE and air sparging <br />techniques and treatment of extracted vapors by catalytic oxidation at a half-acre retail building site. Performed <br />TPDES permitting and monthly well gauging and reporting, quarterly groundwater sampling I reporting; and site <br />closure negotiations with EPA and local regulators. Responsible for groundwater sampling and data collection, field <br />and laboratory results preparation and analysis, and technical report. Fees: $139,300. Estimated Completion: <br />12/31/2004. <br /> <br />Staff Engineer: TransMontainge - Activities have included Phase II Environmental Site Assessment including direct <br />push soil sampling (Using Geoprobe Technology), field screening with a Toxic Vapor Analyzer (Equipped with a <br />Flame- Ionization Detector), followed by groundwater well sampling. Phase II Environmental Site Assessment <br />activity for this project was related to suspected petroleum hydrocarbon contamination. <br /> <br />STANDARD FORM 330 (6/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.