My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Russell Partnership, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
The Russell Partnership, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:36:31 PM
Creation date
8/29/2008 12:57:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />o <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />c <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br />o <br />. <br />o <br /> <br />- <br /> <br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Quality Control and Assurance <br /> <br />Walter B. Martinez <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT <br />FIRM <br /> <br />41 <br /> <br />32 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />The Russell Partnership, Inc. Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Civil Construction Degree 1 19581 Construction <br />University of Havana 1 1958 - 1960 1 Architecture <br />University of Miami 1 1963 - 1964 1 Architecture <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />I 972-to-date <br />1 973-to-date <br />1977 -to-date <br />1980/81 <br />1982 <br />1979 <br /> <br />1982 <br />1984 <br />1986 <br />1991 <br />1992 <br />1999 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Architecture 1 1990 1 Florida #4818 <br />Architecture /1991 1 Texas #13531 <br />General Contractor/1973-to-date 1 Florida #C005293 <br />Building Inspector 1 1997 1 Florida #6304 <br />Interior Designer 1 1997 1 Florida #3957 <br /> <br />American Institute of Architects, # 004970703 <br />N.C.A.R.B.#13855 <br />National Association of Cuban Architects <br />Director Florida South Chapter A.I.A. <br />President Florida South Chapter A.I.A. <br />National Association of Cuban Architects, Service to the Profession <br />Silver Medal, Florida South Chapter AlA <br />Pullara A ward, Florida South Chapter AlA <br />National Association of Cuban Architects, Gold Medal Award <br />Award of Service, Florida South Chapter AlA <br />Chairman, Board of Architecture State of Florida <br />Award of Recognition, Florida State Board of Architecture and Interior Design <br />Aurora A ward, Custom Home - "One of a Kind" <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Lummus Park Recreation Building & Site Improvements PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, FL 2004-Present NA <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Lummus Park Recreation Building & Site Improvements. Architectural and Engineering Services for an <br />a. addition and miscellaneous improvements to the recreation building. Renovate and improve site amenities. <br /> This project includes a 700 sq. ft. addition to the existing recreation building, exterior lighting of building, <br /> parking, additional light poles to improve light level, new ADA drinking fountain, toilet rooms, new dumpster <br /> enclosure and renovations to the recreation building. <br /> Construction Cost $340,000.00. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Flagler Grove Park - Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2006-present Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm <br />b. <br /> This project Consists ofthe design and construction of a neighborhood park. It includes two soccer Fields, <br /> playground, restrooms and parking lot. Special attention was given to xeriscape, the use of native plant <br /> material, security, aesthetics and the creation of a strong buffer to the neighboring housing to the north. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.