|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />12. NAME
<br />Ramon Soria, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />- T 13. ROLE IN THIS CONTRACT' -- I 14 YEARS EXPERIENCE
<br />I Principal-in-Charge -a TOTAL r b WiTH CURRENT FIRM
<br />
<br />23
<br />
<br />15
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Marlin Engineering, Inc.
<br />
<br />-- --
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science in Civil Engineering,
<br />University of Miami, Coral Gables, Florida
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1984 State of Florida Professional Engineer #41218, 1989
<br />
<br />J_
<br />lB. OTHER PROFESSIONAL QUALIFICATIONS (Publicat,ons, Organizations, Training, Awards, etc.)
<br />Civil Engineering Honor Society (Chi-Epsilon)
<br />American Society of Civil Engineers
<br />
<br />19. RELEVANT PROJECTS
<br />I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />NW 25th Street PD&E, FOOT District 6, Miami, FL rOFESSIONAL SERVICESl CONSTRUCTION (If applicable)
<br />
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE - - ~ X J Check if project perfO~'th current firm- -
<br />a. As Project Manager and Principal-in-Charge, Mr. Soria was responsible for the Project Development and Environmental Study of this
<br />principal arterial servicing Miami International Airport cargo facilities. Apart from the normal technical activities associated with the study
<br />such as, preparing corridor studies, traffic reports. master plans, engineering reports, and preliminary alignment design, Mr. Soria also
<br />rected public workshops and other numerous public and agency meetings.
<br />
<br />
<br />(1) TITLE AND LOCATION (C,ty and State) ---,- (2) YEAR COMPLETED
<br />I Coral Gables Traffic Calming, Coral Gables, Florida jPROFESSIONALSERVICES I_CONSTRUCTION (ffapplicable)
<br />
<br />~j BRIEF DESCRIPTION (Brief scope, size, cost~ AND SPECIFIC RO~ - ~ Check il project performed with current firm
<br />b. As the Project manager for this Citywide Traffic Calming Project, Mr. Soria organized numerous Public
<br />Meetings in which he spoke to hundreds of residents to be able to better analyze existing problems on city
<br />streets. He oversaw the development of the data collection, analysis and recommendations to improve
<br />liability conditions within the city. Mr. Soria was able to bring a community together with respect to traffic
<br />
<br />r - (2) YEAR COMPLETED -
<br />PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br />
<br />1_ _ ..---L - - -
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE !J Check ,I project performed w,th current firm
<br />Mr. Soria was Principal-in-Charge and Project Manager. Mr. Soria was the point of contact for the
<br />I Department and Marlin Engineering, Inc. This Project was composed of the development of numerous work
<br />orders such as, traffic control plans for surface crossing rehabilitation, RHCI, preparing diagnostic sketches,
<br />inspecting park and ride lost, performing closure studies, and other miscellaneous tasks associated with the
<br />
<br />, (1) TITLE AND LOCATION (City and Slate)
<br />, Public Transportation Consultant - Rail, FOOT District 6, Miami,
<br />Florida
<br />
<br />: (1) TITLE AND LOCATION (City and State)
<br />
<br />~ - (2) YEAR COMPLETED
<br />~-----
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE
<br />
<br />__1 _ j - -
<br />~ if project performed with current firm
<br />
<br />d'l
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />(2) YEAR COMPLETED
<br />-- -
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Bnef scope, size, cosl, etc.) AND SPECIFIC ROLE
<br />
<br />Check if project performed with current firm
<br />
<br />e.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|