|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />12. NAME
<br />Sergio Alfonso, Jr., P.E,
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />I 13. ROLE IN THIS CONTRACT
<br />Quality Control Officer a. TOTAL
<br />30
<br />
<br />14. YEARS EXPERIENCE
<br />'b. WITH CURRENT FIRM
<br />15
<br />
<br />15. FIRM NAME AND LOCATION (Clly and Slale)
<br />Marlin Engineering, Inc,
<br />
<br />16 EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S.C.E.T. Florida International University, 1980
<br />A.S., Miami Dade Community College, 1972
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />I State of Florida Professional Engineer # 32518, 1982
<br />State of California Professional Engineer # 35883, 1983
<br />State of North Carolina Professional Engineer # 14603. 1988
<br />
<br />I
<br />I
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publicalions, Organlzalions, Training, Awards, elc.)
<br />Traffic Control Plans - FOOT; Highway Capacity Workshop - Northwestern University; Traffic Signal Workshop - Northwestern University;
<br />Statistical Quality Control- FOOT; Highway User Cost Evaluation - FHWA.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />--~--- - - ~ ---] - - -- ----
<br />(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
<br />1 SR A-I-A RRR Projec~ ndian River County, FL _ "o,,~'o,,' """'" I ,,",,"'''"' '" ~~)
<br />
<br />
<br />(3) BRIEF DESCRIPTION (Briel scope, size, cosl, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br />a. I Quality Control Engineer. and was responsible for the overall quality control of all design activities, This project embraced seven miles
<br />I of major arterial in Indian River County, included development of Resurfacing, Restoration and Rehabilitation (RRR) Report. Extensive
<br />, private driveway coordination. Roadway and signing & pavement marking, utility coordination, design and plan preparation for traffic
<br />monitoring equipment, including sensors and its equipment for one PTMS site.
<br />
<br />I (1)TITLE AND LOCATION (Cily and Stale) (2) YEAR COMPLETED
<br />SR 84 and Paradise Way, Broward County, FL PROFE-SSIONALSERVICES I CONSTRUCTION (/Iapplicable)
<br />
<br />~ 1_ _
<br />(3) BRIEF DESCRIPTION (Briel scope, size, cosl, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm
<br />b, Quality Control Engineer, and was responsible for the overall quality control of all design activities. This
<br />project encompassed the design of an exclusive right turn lane, drainage, utility coordination, signing and
<br />pavement marking.
<br />
<br />(1) TITLE AND LOCATION (Clly and State)
<br />I NW 25th Street, Final Roadway Design, Miami, FL
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES r CONSTRUCTION (II appliCable)
<br />
<br />_ _L _
<br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm
<br />e,
<br />Mr. Alfonso is the Quality Control Engineer responsible for the overall quality control of all design activities.
<br />This is a two mile urban arterial at grade, also including a direct viaduct connector between west of SR 826
<br />I and the Miami International Airport West Cargo Area.
<br />
<br />I (1) TITLE AND LOCATION (Clly and State) l (2) YEAR COMPLETED
<br />SR 826 Connector Ramp at Golden Glades Interchange, Miami, FL r PROFESSIONAL SERVICES I CONSTRUCTION (lfappliCable)
<br />
<br />1- -
<br />- - -1
<br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, elc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />d, Mr. Alfonso was the Quality Control Engineer, and was responsible for the overall quality control of all design operations. His significant
<br />professional expertise contributed to the production of a high quality project by reviewing all documents prior to each submillal, following
<br />specific procedures. Mr. Alfonso checked the roadway design; signing and pavement marking plan for accuracy. adequacy, legibility and
<br />I clarity of presentation, His review comments were referred to project management for corrections or responses, to integrate
<br />management and production efforts and obtain a quality final product satisfactory to FOOT,
<br />
<br />(1) TITLE AND LOCATION (C,ly and State)
<br />SR 80 (Southern Blvd.) from West of Haverhill Road to Parker
<br />Avenue, Palm Beach County, FL
<br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, elc.) AND SPECIFIC ROLE
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES I CONSTRUCTION (If aoplicable)
<br />
<br />X Check If project performed with current firm
<br />
<br />e,
<br />Quality Control Engineer, and was responsible for the overall quality control of design and plan preparation
<br />I activities. This project embraced four miles of roadway reconstruction for a major highway in Palm Beach
<br />County, included lighting justification report, lighting design, signing and pavement marking, Design and plan
<br />preparation for traffic monitoring equipment, including sensors and its equipment for one PTMS site,
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|