Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Sergio Alfonso, Jr., P.E, <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />I 13. ROLE IN THIS CONTRACT <br />Quality Control Officer a. TOTAL <br />30 <br /> <br />14. YEARS EXPERIENCE <br />'b. WITH CURRENT FIRM <br />15 <br /> <br />15. FIRM NAME AND LOCATION (Clly and Slale) <br />Marlin Engineering, Inc, <br /> <br />16 EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S.C.E.T. Florida International University, 1980 <br />A.S., Miami Dade Community College, 1972 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />I State of Florida Professional Engineer # 32518, 1982 <br />State of California Professional Engineer # 35883, 1983 <br />State of North Carolina Professional Engineer # 14603. 1988 <br /> <br />I <br />I <br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publicalions, Organlzalions, Training, Awards, elc.) <br />Traffic Control Plans - FOOT; Highway Capacity Workshop - Northwestern University; Traffic Signal Workshop - Northwestern University; <br />Statistical Quality Control- FOOT; Highway User Cost Evaluation - FHWA. <br /> <br />19. RELEVANT PROJECTS <br /> <br />--~--- - - ~ ---] - - -- ---- <br />(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED <br />1 SR A-I-A RRR Projec~ ndian River County, FL _ "o,,~'o,,' """'" I ,,",,"'''"' '" ~~) <br /> <br /> <br />(3) BRIEF DESCRIPTION (Briel scope, size, cosl, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />a. I Quality Control Engineer. and was responsible for the overall quality control of all design activities, This project embraced seven miles <br />I of major arterial in Indian River County, included development of Resurfacing, Restoration and Rehabilitation (RRR) Report. Extensive <br />, private driveway coordination. Roadway and signing & pavement marking, utility coordination, design and plan preparation for traffic <br />monitoring equipment, including sensors and its equipment for one PTMS site. <br /> <br />I (1)TITLE AND LOCATION (Cily and Stale) (2) YEAR COMPLETED <br />SR 84 and Paradise Way, Broward County, FL PROFE-SSIONALSERVICES I CONSTRUCTION (/Iapplicable) <br /> <br />~ 1_ _ <br />(3) BRIEF DESCRIPTION (Briel scope, size, cosl, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm <br />b, Quality Control Engineer, and was responsible for the overall quality control of all design activities. This <br />project encompassed the design of an exclusive right turn lane, drainage, utility coordination, signing and <br />pavement marking. <br /> <br />(1) TITLE AND LOCATION (Clly and State) <br />I NW 25th Street, Final Roadway Design, Miami, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES r CONSTRUCTION (II appliCable) <br /> <br />_ _L _ <br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm <br />e, <br />Mr. Alfonso is the Quality Control Engineer responsible for the overall quality control of all design activities. <br />This is a two mile urban arterial at grade, also including a direct viaduct connector between west of SR 826 <br />I and the Miami International Airport West Cargo Area. <br /> <br />I (1) TITLE AND LOCATION (Clly and State) l (2) YEAR COMPLETED <br />SR 826 Connector Ramp at Golden Glades Interchange, Miami, FL r PROFESSIONAL SERVICES I CONSTRUCTION (lfappliCable) <br /> <br />1- - <br />- - -1 <br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, elc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />d, Mr. Alfonso was the Quality Control Engineer, and was responsible for the overall quality control of all design operations. His significant <br />professional expertise contributed to the production of a high quality project by reviewing all documents prior to each submillal, following <br />specific procedures. Mr. Alfonso checked the roadway design; signing and pavement marking plan for accuracy. adequacy, legibility and <br />I clarity of presentation, His review comments were referred to project management for corrections or responses, to integrate <br />management and production efforts and obtain a quality final product satisfactory to FOOT, <br /> <br />(1) TITLE AND LOCATION (C,ly and State) <br />SR 80 (Southern Blvd.) from West of Haverhill Road to Parker <br />Avenue, Palm Beach County, FL <br />(3) BRIEF DESCRIPTION (Briel scope, size, cost, elc.) AND SPECIFIC ROLE <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (If aoplicable) <br /> <br />X Check If project performed with current firm <br /> <br />e, <br />Quality Control Engineer, and was responsible for the overall quality control of design and plan preparation <br />I activities. This project embraced four miles of roadway reconstruction for a major highway in Palm Beach <br />County, included lighting justification report, lighting design, signing and pavement marking, Design and plan <br />preparation for traffic monitoring equipment, including sensors and its equipment for one PTMS site, <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />