Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Miguel Soria, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />-'13. ROLEIN THIS CONTRACT <br />Senior Project Engineer I a. TOTAL <br />Constructibility 15 <br /> <br />14. YEARS EXPERIENCE <br />~ b WITH CURRENT FIRM <br />10 <br /> <br />15. FIRM NAME AND LOCATION (City and Stale) <br /> <br />Marlin Engineering, Inc., Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIAUZA TfON) <br />Bachelor of Science in Civil Engineering <br />University of Miami, Coral Gables, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPUNE) <br />State of Florida Professional Engineer , Registration # <br />49359 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc) <br />Traffic Control TC-M-A 22879162 <br />Value Engineering CUS#840603 <br /> <br />19. RELEVANT PROJECTS <br />~-- -- <br />~ (2) YEAR COMPLETED <br />IPROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> <br />1999 TBD <br /> <br />I (1) TITLE AND LOCATION (City and Slale) <br />I NW 25 Street, Final Roadway Design, Miami-Dade County, Florida <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl, elc) AND SPECIFIC ROLE ){]Check ,/ project performed with current firm <br />a. Design Project Manager responsible for the management of this major urban reconstruction project. The design work <br />included but not limited to the horizontal and vertical geometry of NW 25th Street and the overhead viaduct from NW 87th <br />Avenue to NW 67th Avenue. Mr. Soria managed construction plans for the various elements of this major highway project <br />such as drainage, profiles, alignments, cross sections, and traffic control plans according to federal, state, and local <br />standards and guidelines, Mr. Soria also assisted the Department's project manager in the coordination between all <br />'(1)TI1UANDLOCATI0N7c,lyandStale) - - - - - ~ - (2) YEAR COMPLETED - <br />I SR A-1-A (Indian Creek Drive) Roadway Reconstruction, Miami-Dade f-pROFESSIONAL SERVICES fCONSTRUCTION (Ifappticable) <br />I County, Florida _ ----c- _ _ _ _ _ ~ _2004_ ~ ~007 <br /> <br />I (3) BRIEF DESCRIPTION (Bnef scope, Size, cosl, elc) AND SPECIFIC ROLE Xl Check i/ project performed with current firm <br />b'l Project Manager responsible for the management of this urban reconstruction project. Mr. Soria managed the design <br />and plans production for all areas of the project such as the horizontal and vertical alignment, roadway plans, signing and <br />pavement markings, signalization, and lighting. <br />FOOT Project Manager: Dennis Fernandez (305) 470-5569. <br /> <br />, (1) TITLE AND LOCATION (City and Stare) (2) YEAR COMPLETED <br />, SR A-1-A (Ocean Drive) Lighting and Signalization, Broward County, I PROFESSIONAL SERVICES r CONSTRUCTION (If applicable) <br />I Florida 2003 I 2002 <br /> <br />I -. -.. --- - - - 1 - <br />(3) BRIEF DESCRIPTION (Bnef scope, size. cost, elc) AND SPECIFIC ROLE Xl Check ,/ project performed with current firm <br />C. i Project Manager responsible for the management of the design and plans production for signalization and decorative <br />lighting along SR A 1 A in the City of Lauderdale by the Sea for FOOT District 4. <br />I FOOT Project Manager: Jose Velarde (954) 777-4677. <br /> <br />I (1) TITLE AND LOCATION (Clly and Slate) <br />1-95 HOV from North Lake Boulevard to PGA Boulevard, Palm Beach <br />County, Florida <br /> <br />(2) YEAR COMPLETED <br />I PROFESSIONAL SERVICES C-ONSTRUCTION (If applicable) <br />2002 TBD <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl, etc) AND SPECIFIC ROLE xl Check if project performed with current firm <br />d'l This project embraced five miles of high occupancy vehicle (HOV) lane for interstate highway in Palm Beach county, <br />I included lighting justification report, lighting design. signing and pavement marking, including signing for general motorist <br />services. This project also required the coordination with various state and local agencies. Sub-consultant FOOT District <br />Four Project Manager: John Thompson, P.E, (954) 486-1400. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />SR-826 Connector Ramp at Golden Glades Interchange, Miami-Dade <br />County, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2000 <br /> <br />2002 <br /> <br />(3) BRIEF DESCRIPTION (Bnef scope, size. cosl, etc) AND SPECIFIC ROLE X Check ,/ project performed w,th current flfm <br />e. Mr. Soria was the Project Manager, & was responsible for the management of all design operations. The roadway design, <br />signing & pavement marking plan proved to be a challenge due to the complexity in its profiles were a balance of existing <br />and proposed geometry needed to be precise. His management skill directed this project towards a positive outcome to <br />the Department. Mr, Soria was responsible guidance for post design services of this roadway project during construction. <br />Mr. Soria provided the contractor, via the FOOT construction resident engineer, plans clarifications and alternative <br />- - <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />