Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Pete Diaz, PSM <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />T 13 ROLE IN THIS CONTRACT <br />Surveying Manager a TOTAL <br />20 <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br />3 <br /> <br />15. FIRM NAME AND LOCATION (C,ty and State) <br />Marlin Engineering, Inc., Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Degree Studies, Miami-Dade Community College <br />Miami, Florida 1984 <br />Member: Phi Theta Kappa Society <br /> <br />-- -- <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida, Professional Surveyor and Mapper, <br />Registration # 6052 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publlcallons, Organizallons, Training, Awards, elc.) <br />N/A <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (Cily and Slale) - -- I - ~2)YEARCOMPLETED - <br />Sunny Isles Blvd. (SR-826) from Intracoastal Waterway Bridge to iPROFESSioNAL SERVICES 1 CONSTRUCTION (If applicable) <br />Collins Ave, Sunny Isles, Florida ~ . 2005 _ I ~/A _ <br /> <br />(3)BRIEF DESCRIPTION (Brief scope, size, cosl, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm <br />a. This project entailed the collection of Topographic data with specific attention to drainage structures, establish a control <br />I network, Right of Way location. Mr. Diaz was the Survey Project Manager responsible for the direction of all survey <br />activities. Contact Person: George Fischer, Project Manager & Grant Coordinator (305) 947-0606 <br /> <br />1; - (2) YEAR COMPLETED ~ <br />PROFESSIO.NAL SERVICES l:CONSTRUCTION (If applicable) <br />2005 TBD <br /> <br />- - --- <br />(3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE X Check ,f project performed with current firm <br />b. This project entailed the collection of Topography, DTM, Vertical control verification, reestablish points from control <br />I network, LayouULocate bore holes and relate to existing Baseline. Mr. Diaz was the Survey Project Manager responsible <br />for the direction of all survey activities. Contact Person: Project Manager: Miguel Soria, P,E, (305) 477-7575 <br /> <br />(1) TITLE AND LOCATION (Clly and Slate) <br />NW 25 St from NW 87 Ave to NW 67 Ave, Miami, Florida <br /> <br />I <br /> <br />I - - - <br />-- --- --- -- - - - - - <br />(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br />Numerous sites throughout the City of Miami, Miami, Florida~PROFESSIONAL SERVICES FNSTRUcTION (If applicable) <br />1 2005 L 2005 <br /> <br />I (3) BRIEF DESCRIPTION (Brief scope, size, cosl, elc.) AND SPECIFIC ROLE -:xl Check if project performed with current firm - <br />c. This project entailed the collection of Topography, Vertical control verification: recover/reset City monuments as needed. <br />I Mr. Diaz was the Survey Project Manager responsible for the direction of all survey activities. Contact Person: Guido <br />Van Meek, P.E., Project Manager (305) 477-7575 <br /> <br />I (1) TITLE AND LOCATION (Clly and Slale) <br />SR-934 (NW 79 St.) from NW 6 Ave to JFK Causeway, Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />I PROFESSIONAL SERVICES' CONSTRUCTION (If appliCable) <br />2002 TBD <br />~_ 1 <br />(3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc.) AND SPECIFIC ROLE I Check ,/ project performed w'th current firm <br />d, This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way <br />mapping, GPS control. Mr, Diaz was the Survey Project Manager responsible for the direction of survey activities. <br />I Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271 <br /> <br />. - <br />(1) TITLE AND LOCATION (Clly and State) <br />SR-5 (US-1) from SW 304 St. to SW 264 St., Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2001 <br /> <br />2006 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cosl. etc.) AND SPECIFIC ROLE <br /> <br />Check if project performed with current firm <br /> <br />e. This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-at-Way <br />mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities. <br />Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />