|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />12. NAME
<br />Pete Diaz, PSM
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />T 13 ROLE IN THIS CONTRACT
<br />Surveying Manager a TOTAL
<br />20
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />3
<br />
<br />15. FIRM NAME AND LOCATION (C,ty and State)
<br />Marlin Engineering, Inc., Miami, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Degree Studies, Miami-Dade Community College
<br />Miami, Florida 1984
<br />Member: Phi Theta Kappa Society
<br />
<br />-- --
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida, Professional Surveyor and Mapper,
<br />Registration # 6052
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publlcallons, Organizallons, Training, Awards, elc.)
<br />N/A
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />(1) TITLE AND LOCATION (Cily and Slale) - -- I - ~2)YEARCOMPLETED -
<br />Sunny Isles Blvd. (SR-826) from Intracoastal Waterway Bridge to iPROFESSioNAL SERVICES 1 CONSTRUCTION (If applicable)
<br />Collins Ave, Sunny Isles, Florida ~ . 2005 _ I ~/A _
<br />
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cosl, etc.) AND SPECIFIC ROLE Xl Check if project performed with current firm
<br />a. This project entailed the collection of Topographic data with specific attention to drainage structures, establish a control
<br />I network, Right of Way location. Mr. Diaz was the Survey Project Manager responsible for the direction of all survey
<br />activities. Contact Person: George Fischer, Project Manager & Grant Coordinator (305) 947-0606
<br />
<br />1; - (2) YEAR COMPLETED ~
<br />PROFESSIO.NAL SERVICES l:CONSTRUCTION (If applicable)
<br />2005 TBD
<br />
<br />- - ---
<br />(3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE X Check ,f project performed with current firm
<br />b. This project entailed the collection of Topography, DTM, Vertical control verification, reestablish points from control
<br />I network, LayouULocate bore holes and relate to existing Baseline. Mr. Diaz was the Survey Project Manager responsible
<br />for the direction of all survey activities. Contact Person: Project Manager: Miguel Soria, P,E, (305) 477-7575
<br />
<br />(1) TITLE AND LOCATION (Clly and Slate)
<br />NW 25 St from NW 87 Ave to NW 67 Ave, Miami, Florida
<br />
<br />I
<br />
<br />I - - -
<br />-- --- --- -- - - - - -
<br />(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
<br />Numerous sites throughout the City of Miami, Miami, Florida~PROFESSIONAL SERVICES FNSTRUcTION (If applicable)
<br />1 2005 L 2005
<br />
<br />I (3) BRIEF DESCRIPTION (Brief scope, size, cosl, elc.) AND SPECIFIC ROLE -:xl Check if project performed with current firm -
<br />c. This project entailed the collection of Topography, Vertical control verification: recover/reset City monuments as needed.
<br />I Mr. Diaz was the Survey Project Manager responsible for the direction of all survey activities. Contact Person: Guido
<br />Van Meek, P.E., Project Manager (305) 477-7575
<br />
<br />I (1) TITLE AND LOCATION (Clly and Slale)
<br />SR-934 (NW 79 St.) from NW 6 Ave to JFK Causeway, Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />I PROFESSIONAL SERVICES' CONSTRUCTION (If appliCable)
<br />2002 TBD
<br />~_ 1
<br />(3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc.) AND SPECIFIC ROLE I Check ,/ project performed w'th current firm
<br />d, This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way
<br />mapping, GPS control. Mr, Diaz was the Survey Project Manager responsible for the direction of survey activities.
<br />I Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271
<br />
<br />. -
<br />(1) TITLE AND LOCATION (Clly and State)
<br />SR-5 (US-1) from SW 304 St. to SW 264 St., Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />2001
<br />
<br />2006
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cosl. etc.) AND SPECIFIC ROLE
<br />
<br />Check if project performed with current firm
<br />
<br />e. This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-at-Way
<br />mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities.
<br />Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|