|
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />Two-way Peak Hour Roadway Volumes
<br />
<br />..
<br />
<br />
<br /> 0-1.99 1,000 1,450 1,550 1,550
<br /> 2 2.00-4.50 * * 920 1,390 1,500
<br />State >4.50 * * 310 1,100 1,450
<br /> 0-1.99 * 2,190 3,080 3,260 3,260
<br />Two-way 4 2_00-4.50 * * 2,130 3,020 3,190
<br /> > 4.50 * * 720 2,560 3,090
<br />Arterials 0-1. 99 * 3,330 4,640 4,890 4,890
<br /> 6 2.00-4.50 * * 3,300 4,550 4,810
<br /> > 4.50 * * 1,120 3,980 4,650
<br /> 0-1. 99 * 4,210 5,710 5,990 5,990
<br /> 8 2.00-4_50 * * 4,160 5,590 5,900
<br /> > 4.50 * * 1,410 4,990 5,710
<br /> 2 NA * * 780 1,330 1,450
<br />Non-State 4 NA * * 1,810 2,880 3,080
<br />Roadways 6 NA * * 2,800 4,350 4,640
<br /> 4 NA 1,900 3,000 4,500 5,800 7,200
<br /> 6 NA 2,900 4,600 7,000 8,900 1,100
<br />Freeways 8 NA 3,900 6,300 9,500 U,200 15,100
<br /> 10 NA 4,900 7,900 11,900 15,200 18,800
<br /> 12 NA 5,700 9,300 13,900 17,900 22,100
<br /> Source: Florida Department of Transportation
<br /> * Cannot be achieved
<br /> Average Travel Speed During Peak Hour
<br />
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />\III
<br />
<br />-
<br />
<br />-
<br />
<br />..
<br />
<br />\III
<br />
<br />-
<br />
<br />..
<br />
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />-
<br />
<br />
<br />..
<br />
<br />A
<br />B
<br />C
<br />D
<br />E
<br />F
<br />
<br />>42
<br />>34
<br />>27
<br />>21
<br />>16
<br /><16
<br />
<br />>35
<br />>28
<br />>22
<br />>17
<br />>13
<br /><13
<br />
<br />-
<br />
<br />-
<br />
<br />...
<br />
<br />-
<br />
<br />-
<br />
<br />Source: FDOT LOS Manual, 1998
<br />
<br />..
<br />
<br />..
<br />
<br />-
<br />
<br />The following table provides information on the peak hour LOS standards for the City's roadways.
<br />The analysis uses information for the Florida Intrastate Highway System (FillS) combined with
<br />LOS capacities from the 1998 FDar Level of Service Manual. The LOS presented represents
<br />average annual daily traffic rather than peak hour LOS measurements.
<br />
<br />..
<br />
<br />...
<br />
<br />..
<br />
<br />..
<br />
<br />..
<br />
<br />-
<br />
<br />..
<br />
<br />Sunny Isles Comprehensive Plan - Existing Conditions I Background Documents
<br />
<br />40
<br />
<br />..
<br />
<br />..
<br />
|