My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2000-105
SIBFL
>
City Clerk
>
Ordinances
>
2000
>
Ordinance 2000-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2013 4:27:56 PM
Creation date
1/25/2006 4:40:56 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2000-105
Date (mm/dd/yyyy)
10/05/2000
Description
Comprehensive Plan.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />,.., <br /> <br />2000 2015 <br /> <br />.. <br /> <br />- <br /> <br />61. The City shall coordinate with the Metro-Dade Transit Agency, and any hotels <br />that may use buses for evacuation to allocate sufficient transit capacity to safely <br />evacuate the City's households that do not have autos, or persons otherwise unable <br />to evacuate by private automobile. <br /> <br />!IIIII <br /> <br />- <br /> <br />!IIIII <br /> <br />... <br /> <br />6J. Trees susceptible to damage by sustained tropical storm force winds (39 knots) <br />shall be removed from the rights-of-way of evacuation routes and replaced with <br />suitable, preferably native, species. To strengthen trees planted along roadways <br />and reduce future breakage and blowdowns, the City shall implement an ongoing <br />tree maintenance program of regular trimming and fertilizing. This Policy will be <br />implemented in conjunction with Objective 9, Policy 9A, Policy 9D, and Policy <br />12F of the Transportation Element. <br /> <br />!IIIII <br /> <br />.. <br /> <br />.. <br /> <br />.. <br /> <br />- <br /> <br />.. <br /> <br />Objective 7 <br /> <br />.. <br /> <br />Reduce the exposure of life and property in the City to hurricanes through the <br />planning and implementation of pre-disaster hazard mitigation measures. Pre- <br />disaster planning for post-disaster redevelopment shall direct population <br />concentrations away from the undeveloped designated Coastal High Hazard <br />Areas and away from identified high-risk areas during post-disaster <br />redevelopment. <br /> <br />- <br /> <br />.. <br /> <br />... <br /> <br />.. <br /> <br />.. <br /> <br />Policies <br /> <br />" <br />.. <br /> <br />7 A. The City shall cooperate with CoWlty in the development of the Post- <br />Disaster Redevelopment Plan for incorporation into the existing Miami- <br />Dade County Hazard Mitigation Plan to provide comprehensive pre- <br />disaster planning for pre- and post-disaster activities, development, and <br />redevelopment. <br /> <br />, <br />.. <br /> <br />. <br /> <br />7B. During pre-disaster planning, hazard mitigation information shall be <br />provided to the County. <br /> <br />'i;:; <br />.. <br /> <br />" <br />~;~~~/~ <br />.. <br /> <br />7C. Prior to post-disaster redevelopment, sources of funds to reconstrUCt, <br />relocate, or construct new public buildings and infrastructure, consistent <br />with Policy 9F, shall be identified by the County to support and expedite <br />the demands generated by post-disaster reconstrUction. <br /> <br />. <br />~~ <br />II <br /> <br />" <br />.. <br /> <br />Objective 8 <br /> <br />, <br />i <br /> <br />During post-disaster recovery and redevelopment, the City shall cooperate with <br />the County to implement the County's Hazard Mitigation and Post-Disaster <br />Redevelopment Plan and applicable CDMP policies to assist with recovery and <br />hazard mitigation measures that reduce the potential for future loss of life and <br /> <br />" <br />II <br /> <br />" <br />a <br /> <br />City of Sunny Isles Beach Comprehensive Plan <br /> <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.