Laserfiche WebLink
<br />BUILDING DEPARTMENT <br /> <br />FEE SCHEDULE <br /> <br />M021 <br /> <br />M022 <br /> <br />M023 <br /> <br />M049 <br /> <br />MOSO <br /> <br />MOS1 <br /> <br />M027 <br /> <br />M028 <br /> <br />M029 <br /> <br />M030 <br /> <br />M031 <br /> <br />M032 <br /> <br />M033 <br /> <br />M034 <br /> <br />M03S <br /> <br />3. AMUSEMENT RIDES AND DEVICES <br /> <br />Per ride <br /> <br />95.00 <br /> <br />For each permanent unit installed or altered <br /> <br />75.00 <br /> <br />Annual inspection for each ride or device at anyone location (permanent <br />installation only) <br /> <br />75.00 <br /> <br />G. BOILERS AND PRESSURE VESSELS <br /> <br />Installation permits fees (including initial inspections and certificate). Does not include installation <br />or connection of fuel and water lines. <br /> <br />1. BOILERS <br /> <br />The following fees apply to each boiler to be installed: <br /> <br />Boilers less than 837 MBTU - each <br /> <br />$ 85.87 <br /> <br />Boilers 837 MBTU to 6,695 MBTU - each <br /> <br />103.05 <br /> <br />Boilers 6,695 MBTU and up - each <br /> <br />143.12 <br /> <br />Steam driven prime movers - each <br /> <br />68.70 <br /> <br />68.70 <br /> <br />Steam actuated machinery - each <br /> <br />Unfired pressure vessels (operating at pressures in excess of 60 PSI and <br />having volume of more than 5 cu. ft.) each pressure vessel <br /> <br />85.87 <br /> <br />2. FEES FOR PERIODIC RE-INSPECTIONS <br /> <br />Steam boilers (annual) - each <br /> <br />$ 143.12 <br /> <br />Hot water boilers (annual) - each <br /> <br />59.54 <br /> <br />Unfired pressure vessels (annual) - each <br /> <br />52.67 <br /> <br />Miniature boilers (annual) - each <br /> <br />52.67 <br /> <br />Certificate of inspection (where inspected by insurance company) - each <br /> <br />85.87 <br /> <br />Shop inspection of boiler or pressure vessels per completed vessel <br /> <br />85.87 <br /> <br />PAGE 260F 30 <br />