Laserfiche WebLink
<br />-. <br /> <br />December 14, 2006 <br />Revision to the Building Department's Fee Schedule <br />Page 2 of 2 <br /> <br />was modified from $16.80 to $17.00; Mechanical fees on pages 29 and 30 of the <br />schedule were rounded off to the nearest dollar. Contractor Enforcement fees, Criminal <br />Processing Recovery Cost fees, and Florida Building Code - Unsafe Structures fees on <br />pages 31 and 33 were also rounded off to the nearest dollar. <br /> <br />As previously presented at the November 16, 2006 Commission Meeting, because of <br />the upcoming implementation of a new software program in our Department, and in an <br />effort to facilitate and make the fee schedule user friendly, we have re-c1assified and re- <br />codified certain items and sections of the fee schedule. <br /> <br />Equally relevant, among the proposed adjustment to the schedule, we have changed <br />the Landscape Architectural Review Fee, to reflect the current hourly rate charged by <br />the City's Landscape Architect Consultant. We are proposing to change the Building <br />pool deck fee from $112.00 to $2.50 per each $100.00 dollars of estimated job value. <br />We are also proposing to increase our current demolition fee from $10.00 to $50.00 for <br />additional 1000 sq ft of demolition or fraction thereof. We have added a section for the <br />replacement of broken glass for windows and doors. Equally important, and due to the <br />increasing amount of applications for tile installation received by our Department, we <br />have exclusively added a section to address tile installation. Along with the above <br />mentioned changes, we have also made other adjustments to the Electrical and <br />Mechanical schedule which encompass minor modifications to some fees as detailed in <br />the attached, proposed fee schedule. <br /> <br />CLP:pv <br />Enclosure(s) <br />