• <br /> TASK 3-Existing Conditions <br /> Subtask 3.1 —CONSULTANT shall research existing atlases, right-of-way maps, survey, plat, and as- <br /> builts to assess completeness. Once compiled, information will be analyzed to determine if sufficient <br /> to create a base file for design within the corridor. Deficient information will be further analyzed to <br /> determine if absolutely necessary for a complete design. Where determined necessary but <br /> unavailable, a separate scope of services will be provided to obtain additional information. The <br /> purpose of this task is to gather information necessary to create an electronic base-file depicting <br /> existing conditions to be used for design. <br /> • <br /> Subtask 3.2 — Upon gathering existing conditions information and establishing criteria for proposed <br /> design (Subtasks 2.1, 2.2 and 2.3), cost estimates and schedule assumptions can be further refined. <br /> CONSULTANT shall re-assess costs estimates and schedule assumptions provided within Subtask <br /> • 1.1. CONSULTANT'S estimate shall be preliminary in nature.and dependent upon the accuracy and <br /> comprehensiveness of available information. <br /> Note: The above services do not include undergrounJng of overhead Transmission Lines. By their nature, <br /> undergrounding'of Transmission Lines involve more significant issues and are handled within a separate division within <br /> FP&L To avoid impacting progression of undergroundrng efiorts, Transmission Lines will not be addressed within the <br /> abotie scone of services. <br /> INFORMATION PROVIDE BY CLIENT: <br /> • Aerial exhibit of existing pole locations in CAD format <br /> • Any available Atlas and/or as-built information for existing infrastructure. <br /> PAYMENT SCHEDULE <br /> TASK I DESCRIPTION PAYMENT TYPE PAYMENT AMOUNT <br /> Sublask 1.1 I Budget Estimate Lump Sum $6200.00 <br /> 'Subtask 12 I-Project°r=.sentation Lump Sum $2,820.00 <br /> Su ask 2.1 I Mtg.'s w/FP&L T&M $7,810.00 <br /> I Sufbteak 22 I Mtg.'s w/Utilities T&M $3,710.00 <br /> Subtask 2.3 Mto's w/FDOT T&M S 2,150.00 <br /> Subtask 2 E Mia's aril Coorpriiation(CITY) I T&M S 6,800.00 <br /> Subtask 2.5 I Explore l ighting'lasu I T&M S 7,100.00 <br /> 'Subtask 3.1 R°seamh Eicisting fritorfnation I Lump Sum S10.670.00 <br /> :Subtask 32 I•Prefrrrtinary Cosi iirriate I Luirip Sum $7,420.00 <br /> Professional Services Agreement <br /> Project Name: Utility Undergrounduig Consulting <br /> Project Location:Sunny Isles Beacrr,F'. <br /> -®KEITH and SCHNARS, P.4. K&S Proposal No::P5098.MK <br /> _ ENGINEERS,PLANNERS, SURVEYORS Revised i eb uary 2013 Page 6 <br />