My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2010-351
SIBFL
>
City Clerk
>
Ordinances
>
2010
>
Ordinance 2010-351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 2:41:54 PM
Creation date
9/28/2010 2:41:48 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2010-351
Date (mm/dd/yyyy)
09/16/2011
Description
Amd Chap. 156, Revised Fee Schedule for the Building Dept
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Building Department Fee Schedule <br /> <br />Note: Individual permit(s) must be obtained. prior to <br />commencina any proposed work in the common <br />elements. at no additional cost to the applicant. <br /> <br />;~ <br />- <br /> <br />J. PRE-PA YMENT FEES FOR REPAIR PERMITS IN <br />CONDOMINIUM UNITS <br /> <br />J-OOl <br /> <br />J-001.a <br /> <br />J-001.b <br /> <br />J-001.c <br /> <br />Condominium Associations who provide service. <br />maintenance. and/or repair of equipment inside each <br />condominium unit. and who utilize licensed contractors <br />to perform such work. may pre-pay the costs of repair <br />permits on an annual basis. This pre-payment option <br />includes the following work inside the units: <br />. Repair to any part of an A/C unit. where removal <br />and reinstallation of the existing equipment is <br />required. (New equipment installation and/or <br />replacement is not included in this agreement) <br />. Electrical work reauired due to reinstallation of <br />an A/C unit. <br />. Replacement of a garbage disposal <br />. Replacement of a Water Heater <br /> <br />Total Cost of annual pre-payment fees for repair <br />permits including Electrical. Mechanical. and Plumbing <br />permits shall be calculated based on the total number <br />of units in the condominium times the fee. <br /> <br />For individual trades the annual pre-payment fee shall <br />be calculated based on the total number of units in the <br />condominium times the fee as follows: <br /> <br />Mechanical <br /> <br />Electrical <br /> <br />Plumbing <br /> <br />Note: Individual permit(s) for each unit where repair is <br />to be done as described in this section must be <br />obtained. prior to commencing work. at no additional <br />cost to the applicant. <br /> <br />Building Department Fee Schedule - rev. 07/10 <br /> <br />$70.00 <br /> <br />$50.00 <br /> <br />$25.00 <br />$25.00 <br /> <br />Page 37 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.