My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1611
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 3:04:22 PM
Creation date
9/28/2010 3:04:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1611
Date (mm/dd/yyyy)
09/16/2010
Description
Agmt w/LIVS Assoc. Streetscape Improvement Collins at Arlen House
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />. . <br /> <br />September 8, 2010 <br />Rick Conner <br />City of Sunny Isles Beach - Arlen House Streetscape <br />Page 2 of 4 <br /> <br />C. Landscape Design. <br /> <br />1. Site plan design will be further developed beyond the preliminary submittal previously <br />approved by the city. We will ftnther develop exterior spaces through conceptual design <br />and development. <br />2. Landscape design will include all hardscapes as well as planting layout plans, planting <br />plans, irrigation plans and miscellaneous design details. <br />3. Layout plans shall include: <br />o Planters <br />o Site furnishings <br />o Hardscape Elements <br />4. Planting plans shall include: <br />o Trees and sluubs <br />o Ground cover <br />o Planting details <br />o Specifications <br />5. In-igation Plans shall include: <br />o Irrigation plan <br />o Specifications <br />6. Design Details shall include: <br />o Garden elements <br />o Pavers / pavement <br />o planters <br /> <br />II. BASIC SERVICS <br /> <br />A. CONSTRUCTION DOCUMENTS PHASE <br />Based upon an approved design scheme, construction documents will be prepared which <br />define the materials, and components for the project. The completed construction <br />documents shall include civil, landscaping, architectural, and electrical drawings as <br />required to obtain a building permit, as well as bids from qualified contractors, <br /> <br />C. CONSTRUCTION ADMINISTRATION PHASE <br />LIVS Associates will provide services during construction to include: review of contract <br />submittals; responses to questions (RFIs), and issuance of clarifications related to our <br />documents. Two monthly visits will be performed for observation of the work to assist <br />the client in monitoring the progress of the work and compliance with the requirements <br />of the contract docmnents. This phase will be billed on an hourly basis as requested by <br />the City of Sunny Isles Beach per our agreement. <br /> <br />S II, <br />.." <br />
The URL can be used to link to this page
Your browser does not support the video tag.