<br />(9) Cast cylinders to determine when 500 psi compressive strength <br />is obtained for the purpose of transporting field samples to the laboratory. <br />(10) Obtain the Engineer's approval of slump loss test results in <br />terms of elapsed time before concrete placements. <br /> <br />SUBARTICLE 346-4.2.2 (Page 326) is deleted and the following substituted: <br /> <br />346-4.2.2 Certification: If any chloride test data exceeds the limits in Table 4, <br />identify the exception on the Construction Compliance with Specifications and Plans form. <br /> <br />SUBARTICLE 346-6.1 (Page 328) is deleted and the following substituted: <br /> <br />346-6.1 General: Develop a Quality Control Plan (QCP) as specified in Section 105. <br />Meet the requirements of the approved QCP and Contract Documents. Ensure the QCP includes <br />the necessary requirements to control the quality of the concrete. <br />Perform QC activities to ensure materials, methods, techniques, personnel, <br />procedures and processes utilized during production meet the specified requirements. For <br />precast/prestressed operations, ensure that the QC testing is performed by the producer. <br />Accept the responsibility for QC inspections on all phases of work. Ensure all <br />materials and workmanship incorporated into the project meet the requirements of the Contract <br />Documents. <br />When concrete plastic properties (slump, air content and temperature) could be <br />significantly affected by handling between the point of delivery and the point of final placement, <br />including the use of pumps, conveyor belts, troughs, chutes, barge transport or other means, <br />include provisions in the QCP to sample the plastic concrete for all testing at the point of final <br />placement. <br />Ensure the QCP includes any anticipated requirements for adjusting the concrete <br />at the placement site. Include the testing procedures that will be implemented to control the <br />quality of the concrete and ensure that concrete placed is within the tolerance range. Also, <br />include provisions for the addition of water to concrete delivered to the placement site at <br />designated level areas, to ensure the allowable amount of water stated on the concrete delivery <br />ticket or the maximum water to cementitious materials ratio on the approved design mix are not <br />exceeded. Ensure the anticipated ranges of jobsite water additions are described and the proposed <br />methods of measuring water for concrete adjustments are included. <br />Failure to meet the requirements of this Specification or the QCP will <br />automatically void the concrete portion of the QCP. To obtain QCP re-approval, implement <br />corrective actions as approved by the Engineer. The Engineer may allow the Contractor to <br />continue any ongoing concrete placement but the Engineer will not accept concrete for any new <br />placement until the QCP re-approval is given by the Engineer. <br /> <br />SUBARTICLE 346-6.3(Page 329) is deleted and the following substituted: <br /> <br />346-6.3 Delivery Certification: Ensure that an electronic delivery ticket is furnished <br />with each batch of concrete before unloading at the placement site. The delivery ticket may be <br />