My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger - Structural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-07-02 Fishing Pier
>
Specifications
>
Beiswenger - Structural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2010 10:29:44 AM
Creation date
11/4/2010 4:01:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolish Fishing Pier
Bid No. (xx-xx-xx)
10-07-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />proprietary software or in the form of an electronic spreadsheet, but shall be printed. Ensure that <br />the materials and quantities incorporated into the batch of concrete are printed on the delivery <br />ticket. Include the following information on the Delivery Ticket: <br />(I) Arrival time at jobsite, <br />(2) Time that concrete mix has been completely placed, <br />(3) Number of revolutions upon arrival at the jobsite, <br />(4) Total gallons of water added at thejobsite, <br />(5) Additional mixing revolutions when water is added, <br />(6) Total number of revolutions at mixing and agitating speed. <br />Items 3 through 6 do not apply to non-agitating concrete transporting vehicles. <br />Ensure the batcher responsible for production of the batch of concrete signs the <br />delivery ticket, certifying the batch of concrete was produced in accordance with the Contract <br />Documents. <br />Verify that the chloride test results on the delivery ticket meet the requirements of <br /> <br />Table 4. <br /> <br />Sign the delivery ticket certifying that the design mix maximum specified water to <br />cementitious materials ratio was not exceeded due to any jobsite adjustments to the batch of <br />concrete, and that the batch of concrete was delivered and placed in accordance with the Contract <br />Documents. <br /> <br />SUBARTICLE 346-6.4 (Pages 329 - 330) is deleted and the following substituted: <br /> <br />346-6.4 Plastic Property Tolerances: Do not place concrete with a slump more than <br />plus or minus 1.5 inches from the target slump value specified in Table 2. <br />Reject concrete with slump or air content that does not fall within the specified <br />tolerances and immediately notify the concrete production facility that an adjustment of the <br />concrete mixture is required so that it will fall within specified tolerances. Ifa load does not fall <br />within the tolerances, test each subsequent load and the first adjusted load. Iffailing concrete is <br />not rejected or adjustments are not implemented, the Engineer may reject the concrete and <br />terminate further production until the corrections are implemented. <br />Do not allow concrete to remain in a transporting vehicle to reduce slump. Water may be <br />added only upon arrival of the concrete to the jobsite and not thereafter. <br /> <br />SUBARTICLE 346-7.4 (Page 330) is deleted and the following substituted: <br /> <br />346-7.4 Concreting in Cold Weather: Do not mix concrete when the air temperature is <br />below 450F and falling. Mix and place concrete when the air temperature in the shade, and away <br />from artificial heat, is 400F and rising. Protect the fresh concrete from freezing until the concrete <br />reaches a minimum compressive strength of 1,500 psi unless the concrete is to be heat cured. The <br />requirements of concreting in cold weather are not applicable to precast concrete placement <br />operations occurring in a temperature controlled environment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.