<br />QC testing arrives at the site of discharge, subsequent trucks may not discharge until QC testing <br />results are known. Reject non-complying loads at the jobsite. Ensure that corrections are made <br />on subsequent loads. <br />Furnish sufficient concrete of each design mix as required by the Engineer for <br />verification testing. When the Engineer's verification test results do not compare with the QC <br />plastic properties test results, within the limits defined by the Independent Assurance (IA) <br />checklist comparison criteria, located in Materials Manual Chapter 5, disposition of the concrete <br />will be at the option of the Contractor. <br />On concrete placements consisting of only one load of concrete, perform initial sampling <br />and testing in accordance with this Section. The acceptance sample and plastic properties tests <br />may be taken from the initial portion of the load. Ifany of the QC plastic properties tests fail, <br />reject the remainder of that load, terminate the LOT and notify the Engineer. Make cylinders <br />representing that LOT from the same sample of concrete. <br />Following termination of a LOT, obtain samples from a new load, and perform plastic <br />properties tests until such time as the water to cementitious materials ratio, air content, <br />temperature and slump comply with the Specification requirements. Initiate a new LOT once the <br />testing indicates compliance with Specification requirements. <br />Suspend production when three LOTs, or when any five LOTs in two days of production <br />of the same design mix are outside the specified tolerances. Make the necessary revisions to <br />concrete operations and increase the frequency of QC testing in the QCP to bring the concrete <br />within allowable tolerances. Obtain the Engineer's approval of the revisions before resuming <br />production. After production resumes, obtain the Engineer's approval before returning to the <br />normal frequency ofQC testing. <br />If concrete placement stops for more than 90 minutes, perform initial plastic properties <br />testing on the next batch and continue the LOT. Cylinders cast for that LOT will represent the <br />entire LOT. <br />When the Department performs Independent Verification, the Contractor may perform <br />the same tests on the concrete at the same time. The Department will compare results based on <br />the Independent Assurance Checklist tolerances. <br />When the Department's Independent Verification test results do not meet the <br />requirements of this Section, the Engineer may require the Contractor to revise the QCP. <br /> <br />SUBARTICLE 346-9.1 (Pages 333 - 334) is deleted and the following substituted: <br /> <br />346-9.1 General: Perform plastic properties tests in accordance with 346-8 and cast a set <br />of three QC cylinders (either 4 inch by 8 inch or 6 inch by 12 inch cylinders are acceptable), for <br />all structural concrete incorporated into the project. Take these acceptance samples randomly as <br />determined by a random number generator (acceptable to the Department). The Department will <br />independently perform verification plastic properties tests and cast a set of verification cylinders. <br />The verification cylinders will be the same size cylinder selected by the Contractor, from a <br />separate sample from the same load of concrete as the Contractor's QC sample. <br />The Department may perform inspections in lieu of plastic properties tests of the <br />precast plants producing Class I and II concrete. <br />For each set of QC cylinders verified by the Department, cast one additional <br />cylinder from the same sample, and identify it as the QC "hold" cylinder. The Department will <br />also cast one additional "hold" cylinder from each Verification sample. Provide curing facilities <br />