My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construct Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-07-02 Fishing Pier
>
Responses
>
Construct Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2010 4:35:58 PM
Creation date
11/4/2010 4:34:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles <br />Demolition and Reconstruction of Sunny Isles Beach Fishing Pier and Restaurant <br />Project No.1 0-07-02 <br /> <br />Fishing Pier <br /> <br />Item Descriotion Units Quantity Cost Total <br />Mobilization LS 1 $ 50.000.00 $ 50,000.00 <br />Turbiditv Barrier LS 1 $ 10,000.00 $ 10,000.00 <br />Removal and DisDosal of ExistinD Structure /Fishinq Pier) LS 1 $ 241.000.00 $ 241,000.00 <br />Cut existina bent Diles to mud line level LS 1 $ 60,000.00 $ 60,000.00 <br />Furnish and Install 18" Prestressed Concrete Pilina LS 1 $ 967.950.00 $ 967,950.00 <br />Furnish and Install 18" Prestressed Concrete Pilina (Test Piles) LS 1 $ 163,620.00 $ 163.620.00 <br />Load Test. Dvnamic LS 1 $ 32.400.00 $ 32.400.00 <br />Embedded Data Collector LS 1 $ 31.000.00 $ 31,000.00 <br />Furnish and Install Concrete Class IV Substructure LS 1 $ 440,000.00 $ 440.000.00 <br />Neoorene Bearino Pads LS 1 $ 77,000.00 $ 77,000.00 <br />Furnish and Install 18" Deck Slab Units LS 1 $ 1,300,200.00 $ 1,300,200.00 <br />Comoosite Reinforced Pioe Handrail - Guiderail (PVC) LS 1 $ 206.700.00 $ 206.700.00 <br />Furnish and Install naviaation liahtina LS 1 $45,600 $ 45,600.00 <br />Furnish and Install bollard liahtina LS 1 $43.250 $ 43,250.00 <br />Fishing Pier Sub-Total $ 3,668,720.00 <br /> <br />Restaurant <br /> <br />Item Descriotion Units Quantity Cost Total <br />Division 2 - Sitework LS 1 $ 734,500.00 $ 734,500.00 <br />Removal and Disposal of Existing Structure (Restaurant) includes removal of <br />existing stairs and demolition of existing trees. Demoliton will end where the <br />start of the orooosed walk aooroach beains <br />Cut exisiting piles under existing restaurant 2'.0" as required for placement of <br />orooosed Sanitary Sewer Line <br />Link Security Fence , <br />Tree Protection Barrier for South Side Trees <br />Site Preoeration <br />Furnish and Install 18" Prestressed Concrete Pilina <br />Furnish and Install 18" Prestressed Test Concrete Pilina <br />Trench Drain (cj) beainnina of oier <br />Division 3 - Concrete LS 1 $ 257,517.00 $ 257,517.00 <br />Furnish and Install Floor Beam Lavout . <br />Furnish and Install 8" Concrete Slab (from start of new deck to the beginning <br />of fishina oier) <br />Decorative Sidewalk at aooroach <br />Concrete Stairs <br />Concrete Beam for 2nd floor concrete slab <br />2nd floor 6" Concrete Slab <br />Division 4 - Masonry LS 1 $ 67,200.00 $ 67,200.00 <br />Concrete Masonry Units for entire restaurant <br />Brick Pavers @ Decorative Sidewalk matching existing size, color, and pattern <br />set in mortar <br /> .' <br />Division 5 - Metals LS 1 $ 175,800.00 $ 175,800.00 <br />Comoosite Reinforced PiDe Handrail - Guiderail (PVC) <br />Standina Seam Metal Roofs <br />Metal Clad Fascia and Soffit Panels <br />Gutter Svstem <br />
The URL can be used to link to this page
Your browser does not support the video tag.