My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construct Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-07-02 Fishing Pier
>
Responses
>
Construct Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2010 4:35:58 PM
Creation date
11/4/2010 4:34:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONSTRUCT GROUP CORP. <br />STATE CERTIFIED GENERAL CONTRACTOR <br />STATE LICENSE: CG-C062818 <br /> <br />12]0] NW 98TH AVE. STE # 8 <br />HIALEAH GARDENS FL. 33018 <br /> <br />Ph: (305) 824-8845 <br />Fax: (305) 824-3224 <br /> <br />To all interested parties: <br /> <br />Construct Group's approach to the demolition and construction of the of the <br />Pier deviates from the proposed design on one basic concept. We propose <br />using a smaller pre-cast concrete pile to allow for the construction of the pier <br />to be done from above without ever disturbing the ocean floor and <br />minimizing the impact to the marine life of the surrounding area. This <br />approach will help facilitate and expedite the permitting process with the <br />Coast Guard, Army Corps of Engineers and any other agencies that could be <br />involved in the permitting process. <br /> <br />The reduction of the piles from a 24" square pre-stressed concrete pile to an <br />18" square pre-stressed concrete pile will require the spans to be reduced to <br />a maximum of 25' in length, but will allow for the construction equipment to <br />work from above the newly erected spans. The super structure will also be <br />substituted from a double-tee design to an 18" pre-stressed deck consisting <br />of 4' wide pre-cast units. The super structure will additionally be post <br />tensioned laterally at each span for further strengthening of the super <br />structure. <br /> <br />The sequence of the work will be from the beach area out toward the ocean; <br />using the new structure as the construction platform for moving forward <br />with the demolition and construction. Each span will be demolished and <br />constructed within a three week period amounting to 18 months of pier <br />construction. Following the completion of the pier, the restaurant will be <br />finalized within 4 months achieving a substantial completion of the total <br />project within 22 months. Due to the complexity of the structure a 2 month <br />period will be needed to reach Final Completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.