Laserfiche WebLink
<br />Gerard A. Chenevert <br /> <br />Experience Sept 2008 to Present Construct Group Corporation Miami, FL <br /> <br />Senior Project Manager I Estimator -Foundations <br /> <br />· Responsible for all foundation work. This includes driven piles for bridge structures and <br />sheet piles for both seawalls and excavations. Cofferdam sheeting and excavation. <br />· Responsible for estimating and administration of foundation work. <br />· Examples of my projects such as NE 2nd Ave. Bridge, Mic Earlington Hts <br />substructure and 72nd Ave. Bridge are listed in the company resume. <br /> <br />June 2002 to August Ebsary Foundation Company Miami, FL <br />2008 <br /> <br />Project Manager I Estimator Engineering Division <br /> <br />· Responsible for driven pile and sheet pile work. <br />· Expand engineering division to 5 million dollars per year. <br />· Projects include bridge projects, marine projects and cofferdam projects. <br />· Major Projects: <br />o Driven Pile at 9ih Ave. and Coral Way Bridges in Miami, FL <br />o Several Bollards at Port Everglades, Florida <br />o Various cofferdams using sheet pile, rock anchors and tremie seal. <br />o Emergency Flood Wall at Bayou Segnette, Louisiana for the Army <br />Corps of Engineers <br />o Bridge at La Posada Retirement Community in West Palm Beach, FL <br /> <br />March 1996 to June <br />2002 <br /> <br />Project Engineer I Asst. Project Manager <br /> <br />· Responsible for 2 bridges at the Ft. Lauderdale International Airport Entrance project. <br />This included piling, formwork, concrete and precast. <br />· Responsible for all drawing and engineering coordination for the <br />the Royal Park Bridge Temp. Bascule Bridge Project. This bridge included a <br />framework bascule bent. We re used the existing bascule on the temporary bridge. <br /> <br />PCL Civil Constructors <br /> <br />Miami, FL <br /> <br />Senior Estimator <br />· Responsible estimates throughout Florida. The majority were for the Florida Dept. of <br />Transportation. <br />· Responsibilities include finding projects, organizing estimating team, quantity take off, <br />estimating and schedules. <br /> <br />December 1988 to <br />March 1996 <br /> <br />Estimator, Superintendant, Project Manager <br /> <br />· Involved in all aspects of estimating, project management and field work, building water and <br />wastewater treatment plants in south Louisiana. <br /> <br />Cajun Constructors <br /> <br />Baton Rouge, LA <br /> <br />Education 1988 <br /> <br />Louisiana State University <br />Bachelor of Science in Construction <br /> <br />Baton Rouge, LA <br />