My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construct Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-07-02 Fishing Pier
>
Responses
>
Construct Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2010 4:35:58 PM
Creation date
11/4/2010 4:34:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />substructure concrete, superstructure concrete, structural steel erection, <br />mechanical and electrical installation, MSE wall erection, retaining wall <br />placement, drainage, embankment, asphalt placement, lighting, signalization and <br />striping. <br /> <br />Brickell A venue Rigid Pavement Rehabilitation - Oversee the rigid pavement <br />rehabilitation project to repair cracked concrete pavement and install new <br />landscaping and irrigation. <br /> <br />Other Notable Proiects - Venetian Causeway Bascule Bridge Replacement, <br />Venetian Causeway Bridge Rehabilitation, Quialroost Drive Reconstruction, <br />US-l Reconstruction in Homestead, Bird Road Reconstruction <br /> <br />Project Engineer (01/92-02/94) <br />Provided project inspection and contract administration for assigned projects. <br />Supervised the inspection staff to ensure the adherence to contract documents. <br /> <br />Alton Road Bridge Replacement Proiect - Project inspection and contract <br />administration to ensure adherence to project specifications and contract <br />documents during the driving of the pre-cast piles, placement of the substructure, <br />casting of the superstructure, approach slab construction, bridge railings, erection <br />of the retaining walls, drainage installation, base preparation, asphalt placement <br />and final striping. <br /> <br />Julia Tuttle Causeway - Project inspection and administration for the milling and <br />resurfacing, guardrail installation, landscaping and high mast lighting. <br /> <br />Professional Engineering Trainee (01/90-02/94) <br />Performed technical engineering tasks in highway administration, highway <br />location, highway design, bridge design, highway construction and maintenance. <br />Obtained a broad training of all the Departments within the FDOT. <br /> <br />Victor Mendez, P.L.S. <br />Survey Crew (04/84-01/90) <br />Filed calculations and sketches. Construction layouts for highways, sidewalks, <br />curbs, drainage systems, water systems and buildings. <br /> <br />Licenses and Certifications <br /> <br />Registered Professional Engineer, Florida <br />Licensed Engineering Contractor, Miami-Dade County <br />Land Clearing and Grubbing, Plant Construction, Structural Engineering, <br />Concrete, Excavation and Grading, Paving Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.