My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-05-01 Landscape Maint. (Canceled)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2010 4:18:57 PM
Creation date
11/8/2010 4:18:28 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance
Bid No. (xx-xx-xx)
10-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />site, expressage and similar petty cash items in connection with the Work. <br /> <br />4.27.7.9. Cost of premiums for additional Bonds and Insurance required solely because of changes in <br />the Work, not to exceed two percent (2%) of the increase in the Cost of the Work. <br /> <br />4.27.8. The term Cost of the Work shall not include any of the following: <br /> <br />4.27.8.1. Payroll costs and other compensation of Contractor's officers, executives, principals (of <br />partnership and sole proprietorships), general managers, engineers, architects, estimators, lawyers, <br />agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the <br />site or in his principal or a branch office for general administration of the Work and not specifically <br />included in the schedule referred to in this document - all of which are to be considered administrative <br />costs covered by the Contractor's fee. <br /> <br />4.27.8.2. Expenses of Contractor's principal and branch offices other than his office at the site. <br /> <br />4.27.8.3. Any part of Contractor's capital expenses, including interest on Contractor's capital <br />employed for the Work and charges against Contractor for delinquent payments. <br /> <br />4.27.8.4. Cost of premiums for all bonds and for all insurance policies whether or not Contractor is <br />required by the Contract Documents to purchase and maintain the same (except as otherwise <br />provided this document. <br /> <br />4.27.8.5.Costs due to the negligence of Contractor, any Sub-Contractor, or anyone directly or <br />indirectly employed by any of them of for whose acts any of them may be liable, including but not <br />limited to, the correction of defective work, disposal of materials or equipment wrongly supplied and <br />making good any damage to property. <br /> <br />4.27.8.6.Other overhead or general expense costs of any kind and the costs of any item not <br />specifically and expressly included in this document. <br /> <br />4.27.9. The Contractor's fee which shall be allowed to Contractor for their overhead and profit shall be <br />determined as follows: <br /> <br />4.27.9.1. A mutually acceptable firm fixed price; or if none can be agreed upon; <br /> <br />4.27.9.2. A mutually acceptable fixed fee based on the estimate of the various portions of the cost of <br />the Work. <br /> <br />4.27.10. The amount of credit to be allowed by Contractor to City for any such change which results in a net <br />decrease in cost, will be the amount of the actual net decrease. When both additions and credits are <br />involved in anyone change, the net shall be computed to include overhead and profit, identified <br />separately, for both additions and credit, provided however, the Contractor shall not be entitled to <br />claim lost profits for any Work not performed. <br /> <br />4.27.11. Whenever cost of any Work is to be determined pursuant to this document, Contractor will submit in <br />form prescribed by City an itemized cost breakdown together with supporting data. <br /> <br />4.28. Payments to Contractor: At least ten (10) days before each progress payment falls due (but not <br />more often than once a month), the Contractor will submit to the City a partial payment estimate filled out and <br />signed by the Contractor covering the Work performed during the period covered by the partial payment <br />estimate and supported by such data as the City may reasonably require. <br /> <br />PAGE 20 OF 96 <br />BID No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.