|
<br />
<br />new structures to provide space and infrastructure for the Fire Alarm offices, new storage (1st fl), 2 new
<br />classrooms (3rd fl), Fire alarm office and restroom plus 2 new offices, new public restrooms and new lounge
<br />(4th fl), Mechanical, Electrical and Telecom rooms as needed; new mechanical room at existing 6th floor.
<br />The project also includes, re-roofing of existing main roof area; installation of hurricane proof shutters to new
<br />glaze opening; addition of a metal stairs communicating the parking area and the fourth floor; replacement
<br />and modifications of existing building's communication and emergency power systems; upgrading building's
<br />emergency fire protection systems, emergency lighting and alarm system; installation of telephone conduit
<br />system to support emergency operations and provide new building lightning protection system; enclosure
<br />of existing two (2) story museum space by expanding the existing mezzanine level with a structural floor
<br />system (fourth floor); remove existing spiral staircase in the SW corner of the museum and provide neces-
<br />sary means of egress; provide break-out/office rooms in new floor area; provide communications, power and
<br />data to Command Center and areas identified by the Emergency Management Coordinator; Installation of a
<br />new card reader/ parking lot security system in two points; replace entire HVAC system creating a 5th floor
<br />Pent-house to house new systems.
<br />
<br />Miscellaneous Professional Service Agreement, R-1292-89,1989-1991 For Miami-Dade County Avia-
<br />tion Department, Miami, FL- Principal-in-Charge: List of Service Orders under this PSA: Proposed Snack
<br />Bar at 'E' Satellite, MIAD Cargo Building 2142 Renovations,Terminal North 4th Floor Improvements, Park 8
<br />Bus Station Shelter MCC-2-88, MIAD Cargo Building Study, Airline Relocation Concourse 'B', 'C', 'F', Con-
<br />course 'C' Loading Bridges, Eat N Fly Snack Bar, B/C Modification of Ticket Counters, Concourse 'C' Loading
<br />Bridges, Miscellaneous Airline Relocation Concourses E-F, West Gate Temporary Shelter, MIA-In-Transit
<br />Lounges (Phase I), Terminal Wide Airline & Finishes, Cargo Building 2130 & 2134, Terminal Wide Airline &
<br />Finishes, Study/LCD Signage Program, U.S. Customs Offices & K-9 Area,and Passenger Loading Bridges
<br />G2, G4, G6, 812.
<br />
<br />Miscellaneous Professional Service Agreement, R-652-92, 1992-1994 For Miami-Dade County
<br />Aviation Department, Miami, FL- Principal-in-Charge: List of Service Orders under this PSA: Cargo
<br />Clearance Center (CCG) Customs Refurbishment - Phase II, Miscellaneous Interior Improvements,
<br />Concourse 'G' Throat Food Service & Cocktail, GSA Renovations - Building 100, Concourse 'E' Child
<br />Stage Area,Temporary Parking Design at CCC, Sign Package for CCC-192 Cargo Building, Termi-
<br />nal North 4th Floor Improvements Phase 5, Terminal Wide & Finishes (Packages 6&7), CCC-192 Cargo
<br />Buildings Colors, 'G' Throat Food Service (Program), Concourse 'E' Playground, Interim Commuter
<br />Terminal (MCC) and CCC-1-192 Cargo Buildings Construction Program.
<br />
<br />Black Creek Park at the Hammocks, Miami, FL - Principal-in-charge: Overall coordination of design de-
<br />velopment to project completion of new $750,000 community center and pools. Scope of project included
<br />a new community recreational center with functioning kitchen, two pools and a sunning deck. Program also
<br />required integrating existing basketball/racquetball/tennis courts to new center with extensive landscape
<br />architecture.
<br />
<br />Wildlime Park at the Hammocks, Miami, FL - Principal-in-charge: Design development, documentation
<br />and project management of a $1,200,000 recreation center with adjoining pools. Project included new com-
<br />munity center with pools and sun deck along with extensive landscape planning to integrate existing outdoor
<br />facilities.
<br />
<br />West Kendall District Dog Park, Miami, FL - Principal-in-charge: Overall coordination of 560 SF, one story
<br />masonry restroom and parking lot facility for the West Kendall Dog park. The Dog park houses two separate
<br />fenced areas with circular walkways and a center open-landscape area to allow your pet to play free with
<br />other dogs. The two areas will allow owners to walk their dogs with other dogs similar in size.
<br />
<br />.~~n
<br />
<br />Pembroke Pines Chapel Trail Master Plan, Pembroke Pines, FL - Principal-in-charge: Responsible for the
<br />master plan of 54-acre site which included a charter school, a storage building, a warehouse/office complex,
<br />a shopping center, a community park and 110 town homes.
<br />
<br />Total Document 44 of 50
<br />
|