Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Raul Estevez Quality Control Coordinator <br /> a. TOTAL I b. WITH CURRENT FIRM <br /> 33 27 <br />15. FIRM NAME AND LCOATION (CITY AND STATE) <br />Wolfberg Alvarez & Partners, Inc.. 1500 San Remo Ave.. Ste. 300, Coral Gables, FL 33146 <br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />Completed course work towards mechanical engineering degree Not applicable <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc.) <br />Mr. Estevez, as VP of Project Management serves as a Project Manager and/or an Engineering Coordinator for the programming, plan- <br />ning. design and construction of WA's projects. He has taken a leadership role in the development of a wide range of complex projects <br />throughout the South Florida area. Mr. Estevez has been responsible for various large-scale and complex ventures such as the North <br />Terminal C-D Infill at the Miami International Airport among many at MIA and for various projects with local municipalities. <br /> 19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (Cilyand Slale) (2) YEARS COMPLETED <br /> Three AlE Consulting Contracts with GSA. Region 4 for New Con- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> struction and Improvements to US Post Offices, Courthouses and 1987-1990.1991-1994, 1987-1990,1991-1994, <br /> Other Federal Buildings throughout the Southeastern US. 1995-1998 1995-1998 <br />(3) BRIEF DESCRIPTION (Bnef Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Quality Control Coordinator for three (3) separate consulting contracts involving AlE investigations and design, as well as construction <br />administration services, for a variety of alterations and improvements to US Post Offices and Federal buildings in the Southeastern <br />United States. <br />X Check if Project performed with current firm. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> U.S. Coast Guard Housing, Grassy Key, Marathon, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2009 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Manager for Program EvaluationNerification. as well as complete Architectural, Electrical, Mechanical, Plumbing and Civil Engi- <br />neering services including the development of construction documents, construction period services and Project Management for the <br />project. The project consists of the proposed phased development of eleven (11) residential units to be constructed in the Sunset Bay <br />subdivision on Grassy Key, Marathon. Florida and intended for use by U.S. Coast Guard personnel stationed at the USCG Station <br />Marathon. <br />X Check if Project performed with current firm. <br />c. (1) TITLE AND LOCATION (City and Slale) (2) YEARS COMPLETED <br /> Renovation and Energy Retrofit of Public Schools, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> County, FL 2001-2003 2001-2003 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Quality Control Coordinator for Architectural services for investigations and design for renovation and retrofit of elementary, <br />junior and senior high schools including the renovation of Miami Beach Senior High School including modernization of the <br />auditorium and renovation to Miami Center Central High. Various projects ranging is cost from $100,000 to $1,000,000. <br />X Check if Project performed with current firm. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2008-2009 2008-2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Quality Control for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing system <br />and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to building <br />around the City. Project cost varies from $50.000 to $250,000. <br />X Check if Project performed with current firm. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> General AlE Consulting for the Village of Palmetto Bay, Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Bay, FL 2006 2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Quality Control Coordinator for multi-disciplined engineering and architectural support services the City for a variety of projects. This <br />included Preparation of studies and reports, planning. design of building additions and improvements, upgrading of engineering sys- <br />tems. site planning and improvements. Preparation of construction documents, Construction phase services. <br />X Check if Project performed with current firm. <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />