Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete section F for each project.) <br /> <br />20. Example Project <br />Key Number <br />8 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Project Consultant for Additions & Improvements, Miami-Dade <br />County Public Schools, Miami, FL <br /> <br />22. Year Completed <br />Professional Services I Construction (if applicable) <br />1995-2000 1995-2000 <br /> <br />a. PROJECT OWNER <br />Miami Dade County Public Schools <br /> <br />23. PROJECT OWNER'S INFORMATION <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Carlos Havia 305-995-4742 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />The performance of this Contract has involved more than 165 separate projects requiring a <br />working knowledge of: <br /> <br />. School Board and DOE Administrative and Technical Requirements <br />. State Board Rule 6A-2 and other applicable Codes <br />. Educational Specifications including Facilities Lists <br />. DCPS Design Criteria <br />. Various DCPS Procedural Manuals <br />. DCPS and AlA Master Specifications <br /> <br />Complete Engineering, Architecture plus Interior Design services for investigations of facilities and <br />MEP systems, design, construction administration and related consulting services for projects of <br />new construction, modifications and additions. These have included: <br /> <br />. Roof replacement for more than 70 schools <br />. Programming & Planning <br />. Preparation of Florida Inventory of School Houses (FISH) <br />. AlEII Design of new construction renovations and additions <br />. Roof Replacement for more than 50 schools <br />. Central Automated Energy Management Control Systems <br />. Research and Recommendations for Pilot Program for reduction of electrical loads through <br />Value Engineering <br />. Preparation of DOE FLEET Submittals <br />. Preparation of As-Built Drawings <br />. Site Improvements including Paving, Drainage and Walks <br />. Construction Administration <br />. Project Closeout <br /> <br />Cost: Various Tasks orders ranging from $100,000 to $2,000,000. <br /> <br />a. <br /> <br />(1) FIRM NAME <br />WOLFBERG ALVAREZ & PARTNERS <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(2) FIRM LOCATION <br />Coral Gables, FL <br /> <br />(3) ROLE <br />Prime Consultant. Project <br />management, architecture, <br />mechanical, electrical and <br />plumbing, cost estimating, <br />construction management <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />