Laserfiche WebLink
<br />SUNNY ISLES BEACH- RFQ NO. 10-04-02 FOR PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />F. example projects which best illustrate proposed teams <br />qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each projects <br /> <br />21. TITLE AND LOCATION (City and State) <br /> <br />Arthur E. Teele Community Center <br />Miami, FL <br /> <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br /> <br />10 <br /> <br />22. YEAR COMPLETED <br /> <br />PROFESSIONAL <br />SERVICES <br /> <br />CONSTRUCTION (if applicable) <br /> <br />2008 <br /> <br />2010 <br /> <br />The City of Miami <br /> <br />b. POINT OF CONTACT NAME <br /> <br />305.416.1245 <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />Mr. Marcel Douge <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Zyscovich designed the Arthur E. Teele Community <br />Center as the second phase to the Little Haiti Soccer <br />Park. This building houses the City's local Neighborhood <br />Enhancement Team offices. Park offices, restrooms, a <br />Community Meeting room and a large Multi-purpose <br />room. Additionally, the project has covered, exterior space <br />designed as complimentary event space. The building is <br />sited as to allow prominence on the street, while planning <br />on a future connection to a third phase activities building <br />and providing direct access to the soccer park amenities. <br /> <br />In order to expedite the project, the City requested that <br />Zyscovich provide a re-use of an existing City Park Building <br />from another neighborhood. As part of the scope, Zyscovich <br />provided services to modify the building's design so that it <br />responded to the context of the Little Haiti Community, <br />and in doing so, was able to better accommodate the <br />neighborhood's programming needs. Zyscovich provided <br />re-design services and produced 100% construction <br />documents in 5 weeks. Size: 3,500 SF Cost: $1.2 M <br /> <br /> <br /> <br />(1) Firm Name <br />Zyscovich, Inc. <br /> <br />25 FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br /> <br />(3) Role <br /> <br />Architectural Design, Master Planning, <br />Community Enhancement and <br />Redevelopment <br /> <br />(2) Firm Location (City & State) <br />Miami, FL <br /> <br />ZYSCOVICH <br />ARCHITECTS <br />