Laserfiche WebLink
<br /> <br />W. Ronald Hunt, PE, LEED AP <br /> <br />Structural Engineer <br /> <br />39 <br /> <br />35 <br /> <br /> <br />AECOM Technical Services, Inc., Coral Gables, Florida <br /> <br /> <br /> <br />Bachelor of Science, Structural Engineering, Louisiana State <br />University <br /> <br />Professional Engineer, Florida, Georgia <br /> <br /> <br /> <br />Mr. Hunt, an Engineering Director and Structural Engineering Principal at AECOM, he is in charge of all structural engineering <br />requirements and participates directly in all projects to ensure proper design, coordination, and responsiveness. Mr. Hunt has <br />extensive experience in structural design for both new construction and renovation, for many of the firm's major projects, including a <br />broad range of facility types including judicial facilities, educational, commercial, industrial, institutional, corporate I office, airports, <br />rapid transit and prisons and jails for federal, state and local governments. <br /> <br />~?, RE~E\ii-/<l ~RG..iE=T:: <br /> <br />i "",' ~'-"-:....E L\!'~=' ,-C'="L"""!'~)f\ iei!\. anc SraTS; <br />I ~--~-~~-~---~~-~- . ------~-~-~ ~--~--~---~-~--_i_~---~-~---.--..--.------- <br />: City of Sunny Isles Beach Government Center l-=~5:~~~_:,-"'I:J\,,Lc SECC<\/ICES ! CONSTRUCTIC:!~ Ii aool'C3,:"0 <br />i Sunny Isles Beach, Florida <br />L- <br />a ~-"--BR!EC ::JESCRIFTION (Bne: scope size_ cost_ ere ",ND SPECIFIC ROLE 10 Chec~, I' prOject perfocmed with CUiient firm __~~_ <br /> <br />! A 58,000 SF government complex inclusive of city hall, commission chambers, police facility, and a public library, Due to the <br />1 facility's adjacency to the waterfront, the building will be designed to withstand most hurricanes. Also included is a parking <br />1 garage, Cost: $15M; Role: Structural Engineer <br />I <br />I <br />I,') TiTLE _Ai\jC ,-OC,L,TiON fCity and State) <br /> <br />:= \'EL,~ c,()r\1P~E:EC <br /> <br />2003 <br /> <br />2004 <br /> <br />(2.: YE_AR COMPLETED <br />~ <br />j City of Sunny Isles Beach Heritage Park & Parking Garage ~OFE~'-S?~i:'~~ER\ICES _~ i CONSTRUCTION (i' aopl!ea~,le; <br />I Sunny Isles Beach, Florida 2009 ! 2010 <br />i I <br />b_ 13; BRIEF ::JESCRIFTIOI\j IBne: scope. Size ccst erei AND SPECIFiC ROLE i 0 Check If prOject perfocmed with current firm <br /> <br />I Planning and design for a new parking garag-ewhich was incorporated into a new 4-acre community park, The 500+ car garage <br />i consists of 4-levels of parking and includes functional space for concessions, park support space, and public works at the first <br />[level. The park component includes a children's playground, plaza and gazebo, Cost: $11 M; Role: Structural Engineer <br />I <br />, <br /> <br />.._~---~-- <br />! AECOM is providing complete architectural and engineering design services for the Collier County Government Center Fixed <br />I Term Contract Completed projects include the Courthouse 4th Floor Renovations, Jail Renovations, Chiller Plant Expansion and <br />'I' Renovations, Secure Judges Parking Expansion, Building F Elevator Study, and Government Center Master Plan Update, <br />I Role: Structural Engineer <br />II_ 1) TiTLE AND LOCAT!ON (City and State) (2) YEAR COMPLETED <br />I ~~~-~~----~--~-+- " ,I " -~~ <br />IT f S rf 'd C 't C t I PROFESSIOi\JAL SERViCES I CONSTRUCTION (if apo/lcao!e; <br />,own 0 u Sl e ommunl y en er I ~--~._--- <br />! Surfside, Florida , 2010 ! 2011 <br />~ I I <br />d 1,3) BRiEF DESCRIPTIO!\ (Bnef scope, Size. cost et:;~;:;-~;. SPECIFIC ROLE 10 Che~ck If project performed With current firm <br /> <br />I The Town of Surfside selected AECOM to provide comprehensive pla~ning and design services for their new 16,000 SF muiti---~- <br />j purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete, The building is <br />! registered and is expected to meet LEED NC Silver certification, Cost: $5M; Role: Structural Engineer <br />, <br /> <br />i ,-, \ TiTLE AND LOCATION (City and State) ! (2) YEAR COMPLETED <br />I i PROFESSiONAL SERViCES I CONSTRUCTION (If app/lCabie; <br />~village of Key Biscayne Government Center !~--~-~----~-~-- , ~-~-~~~~---- <br />I Key Biscayne, Florida , 2001 I 2002 <br />I .+-~-------~---~-~ I ~~~~----~.~ <br />e. h3) BRIEF DESCRIFTION (Brief scope. size. cost. etci AND SPECIFIC ROLE 10 Check if project performed with current fir=,--_~____ <br /> <br />I A City Hall, Police Headquarters, and public Parking Garage. The project was master planned and designed as a low scale <br />I campus environment open and accessible to all citizens. The center is located adjacent to the Village's main public park. <br />I Cost: $6.6M; Role: Structural Engineer <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br />