Laserfiche WebLink
<br /> <br />Emilio Rivero, PE, LEED AP <br /> <br />Electrical Engineer <br /> <br />33 <br /> <br />20 <br /> <br /> <br />AECOM Technical Services, Inc., Coral Gables, Florida <br /> <br /> <br />Bachelor of Science, Electrical Engineering, University of <br />Havana <br /> <br />Professional Engineer, Florida <br /> <br /> <br />Emilio Rivero has over 30 years electrical engineering experience specializing in power and control systems, including power <br />distribution, technology upgrades, audio and telecommunications, security and fire protection monitoring systems, energy audits, <br />and energy conservation design. He is experienced in electrical engineering design for many project types, including numerous <br />courthouse facilities and detention/corrections, law enforcement. <br /> <br />'" REi-E\iAJ-..JT PRCJEC.~,::: <br /> <br />I~-=-::::.E .,L,hi: ,-OC~,L,-:~C:H\ i,'City ar,d State) <br /> <br />:2. "E,L,R COMPl.ETE) <br />~~~~;::S~<Jt\A~ SERVICES I CONSTRUCTIOh' <br />I 2003 I 2004 <br /> <br />f~ a:JDilc-a~J;E <br /> <br />[ City of Sunny Isles Beach Government Center <br />i Sunny Isles Beach, Florida <br />e <br />a. 1\3,: BR.1EF DESCRIPTiO~' (Brief scope. SIZE. cost, etc,: <br />I------ ~ <br />i A 58,000 SF government complex inclusive of city hall, commission chambers, police facility, and a public library. Due to the <br />I facility's adjacency to the waterfront, the building will be designed to withstand most hurricanes. Also included is a parking <br />i garage. Cost: $15M; Role: Electrical Engineer <br /> <br />I <br />.L\I\jC SPECIFIC ROLE! 0 Check If pro!ect performed with current firm <br />j , - <br /> <br />~TiTLE At,,) LOCATION (City and State) I (2; YEAR COMPLETED <br /> <br />: ~~~~: ,;~~o~~~'~~. ~~:c~~a Hentage Pack & pa ck'og Gamge ~CESSIO~~~:E RVICES I CONSTRUCT~~~;" appl"",,,. <br /> <br />I I' <br />b I':, BRIE;:- JESCP,IPTION (Brief scope. Size CDS!. ec~_~~~~~CIFIC ROLE I 0 Check ,f ;yoJect performed with current firm ~ ~_~__~__~_ <br />i Planning and design for a new parking garage which was incorporated into a new 4-acre community park. The 500+ car garage <br />1 consists of 4-levels of parking and includes functional space for concessions, park support space, and public works at the first <br />i level. The park component includes a children's playground, plaza and gazebo. Cost: $11 M; Role: Electrical Engineer <br />I <br /> <br />1(:. TiLE AND LOC,L.TION (Gltv anc State; (2) YEAR COIv1PLETED <br />I - .~--,-~--------+---- <br />I Collier County Government Center Fixed Term Contract ! PRO;:-ESSIONAL SERVICES I CONSTRUCTlor~ (If app/lcable) <br />I Naples, Florida Varies (2005-2009) I Varies (2007-2010) <br /> <br />C ~~! BRIEF DESCRiPTION (Brief scope Size COSt. erc. ME) SPECIFIC ROLE i 0 Check if project performed with current firm <br /> <br />I AECOM is providing complete architectural and engineering design services for the Collier County Government Center Fixed <br />i Term Contract. Completed projects include the Courthouse 4th Floor Renovations, Jail Renovations, Chiller Plant Expansion and <br />i Renovations, Secure Judges Parking Expansion, Building F Elevator Study, and Government Center Master Plan Update. <br />Role: Electrical Engineer <br />I ('; Tm~E ,L,ND LOCATION (City and State' <br /> <br />I Town of Surfside Community Center <br />I Surfside, Florida <br />f----- - -+---~~ <br />d I (31 BRIEF DESCRIP~ION (Brief Sc~~~!!!ze cost. etc; AND SPECIFIC ROLE 10 Check if project performed with current firm <br /> <br />I The Town of Surfside selected AECOM to provide comprehensive planning and design services for their new 16,000 SF multi- <br />I purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete. The building is <br />registered and is expected to meet LEED NC Silver certification. Cost: $5M; Role: Electrical Engineer <br />, <br /> <br />(2) YEAR COMPLETED <br />lPROFESSiOh,,L,L SERVICES I CONSTRUCTION (If app!lcab~~) <br /> <br />I 2011 <br /> <br />2010 <br /> <br />P I iTLE AI~D LOCATION (City and State) <br /> <br />I Village of Key Biscayne Government Center <br />! Key Biscayne, Florida i 2001 I 2002 <br /> <br />e.1 (3) BRIEF DESCRIPTION (Brief scope size. cost. etc) AND SPECIFIC ROLE 10 Check if project performed with current firm <br /> <br />I A City Hall, Police Headquarters, and public Parking Garage. The project was master planned and designed as a low scale <br />campus environment open and accessible to all citizens. The center is located adjacent to the Village's main public park. <br />Cost: $6.6M; Role: Electrical Engineer <br /> <br />(2) YEAR COMPLETED <br />PROFESSIOhiAL SERVICES I CONSTRUCTION (if applicable' <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br />