Laserfiche WebLink
<br /> <br />Jacqueline Perez, LEED AP <br /> <br />Architecture Production <br /> <br />14 <br /> <br />12 <br /> <br /> <br />AECOM Technical Services, Inc., Coral Gables, Florida <br /> <br /> <br />Bachelor of Architecture, University of Miami <br /> <br />N/A <br /> <br /> <br />~~~_r,._ <br />,,;>-' t:: ,::::;r _ \ '-_ '-,_ <br /> <br /> <br />Ms. Perez has 14 years of experience. At AECOM, where she has worked since 1998, she has worked on municipal, criminal justice, <br />residential, and educational projects. Most recently, Ms. Rodriguez served as Project Architect on both the Sunny Isles Government <br />Center and the Heritage Park and Parking Garage projects. <br /> <br />'S. RELEVANT PROJECTS <br /> <br />, T!T....E ,L.J\!D LOCAT;OJ\ ie/tv 8'IC Stale <br /> <br />2 VEAR CC\!\!;p....E:ED <br /> <br />i City of Sunny Isles Beach Government Center <br />! Sunny Isles Beach, Florida <br /> <br />;::'ROr:cESSI~li\.';, SERVICES <br />t-~-~~-~-~-~._- <br /> <br />1 '=O~\iSTRUCTfO~ iff 5/Jp/lCao/e,i <br /> <br />2003 <br /> <br />2004 <br /> <br />, <br /> <br />a. !;3 BRIEF DESCRIPTION (Brief scope. size cost. etc.'AND SPECIFIC ROl..El~0 Check if proiect performec With current firm <br /> <br />I A 58,000 SF government complex inclusive of city hall, commission chambers, police facility, and a public library. Due to the <br />I facility's adjacency to the waterfront, the building will be designed to withstand most hurricanes. Also included is a parking <br />I garage. Cost: $15M; Role: Architecture Production <br />i <br /> <br />I <br />II" \ TITLE AND LOCATION (CItv and State)' <br />~ . , <br />I City of Sunny Isles Beach Heritage Park & Parking Garage <br />i Sunny Isles Beach, Florida <br /> <br />I (2: YEAR COMPLETED <br />! PROFESS~I\JAL SE~VICES I CONSTRUCTION (If appllcablej <br />I I <br />: 2009 2010 <br /> <br />b i '3\ BRIEF DESCRIPTION 'Brief scope size. cost. ete) AND SPECIFIC ROLE: 0 Check if prOject performed with current firm <br /> <br />I Planning and design for a new parking garage which was incorporated into a new 4-acre community park. The 500+ car garage <br />I consists of 4-levels of parking and includes functional space for concessions, park support space, and public works at the first <br />IleVel. The park component includes a children's playground, plaza and gazebo. Cost: $11 M; Role: Architecture Production <br /> <br />! <br />1,',) TITLE AND LOCATION (City ana State: I (2: YEAR COMPLETED <br />I Town of Surfside Community Center I PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />I Surfside, Florida 2010 I 2011 <br />i I <br />C I (3) BRIEF DESCRIPTIOI" (Brief scope size. cost. eta) AND SPECIFIC ROLE i 0 Check if prOject performec with current firm <br /> <br />! The Town of Surfside selected AECOM to provide comprehensive planning and design services for their new 16,000 SF multi- <br />I purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete. The building is <br />1 registered and is expected to meet LEED NC Silver certification. Cost: $5M: Role: Architecture Production <br /> <br />I (1) TITLE AND LOCATION (City and State) ~ (2) YEAR COlvlPLETED <br />I V'II f K B' G t C t ! PROFESSIOI'JAL SERVICES I CONSTRUCTION (If appiicablej <br />I I age 0 ey Iscayne overnmen en er , I <br />I Key Biscayne, Florida ! 2001 I 2002 <br /> <br />d.1 (3) BRIEF DESCRIPTION (Bnel scope. size. cost. etc.) AND SPECIFIC ROLE 10 Check if project performed with current firm <br /> <br />II A City Hall, Police Headquarters, and public Parking Garage. The project was master planned and designed as a low scale <br />I campus environment open and accessible to all citizens. The center is located adjacent to the Village's main public park. <br />Cost: $6.6M; Role Architecture Production <br />; <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COlv1PLETED <br /> <br />I Miami-Dade County Corrections Master Plan and 2000 Bed Krome fi'~~!ESS~~~~~SERVICES ~_ CONSTRUCTION (If applicable) <br />'I Facility, Miami, Florida i 2008 (master plan) N/A <br />I ' <br />e. ! (3) BRIEF DESCRIPTION ISnef scope size cost etc; AND SPECIFIC ROLE I 0 Check if prOject performed With current firm <br /> <br />AECOM provided comprehensive planning and design services ~ Miami-Dade County Corrections and Rehabilitation <br />I Department. The first phase of the project includes the preparation of a master plan for the Corrections Department, including <br />I system-wide population analysis / projections, and physical/operational evaluations of the six existing facilities. <br />i Role: Architecture Production <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1 <br />