|
<br />
<br />Luis Moran, AlA, CSI, LEED AP
<br />
<br />Quality Assurance/Quality Control
<br />
<br />32
<br />
<br />17
<br />
<br />
<br />
<br />AECOM Technical Services, Inc., Coral Gables, Florida
<br />
<br />
<br />
<br />Bachelor of Architecture, University of Miami
<br />
<br />Registered Architect, Florida
<br />
<br />
<br />,-- ~- --".-.~ ---~. - ~
<br />-;-,..,. ,.,-'~ -- ~_. '-. -
<br />'- '-- '~.. -
<br />
<br />Mr. Moran, a Senior Associate at AECOM, is a registered architect with more than 30 years of experience. As Division Quality
<br />Representative, he coordinates the local implementation of the AECOM Corporate Professional Excellence Program, which defines
<br />the procedures for achieving the corporate quality objectives. As the local liaison with the AECOM Corporate Quality Officer he
<br />oversees adherence to the 9001 :2000 certification requisites. As part of his DQR responsibilities he prepares and conducts training
<br />lectures for the company's staff on various professional and technical subjects.
<br />
<br />'9 F.Ec.E\t,!\T PROJECTS
<br />
<br />,"', Ti'LE ,~!\J=; LOCA,...(Of.."j ;C!ty' an:; StaTE
<br />
<br />-~
<br />PROFESSIO~\jF(~ SER\/j,:ES 'COI~~-'-RUCTIOt\
<br />---+---
<br />i
<br />
<br />2',. \iE,A;::;;, C0MPLE~E::.
<br />
<br />i City of Sunny Isles Beach Government Center
<br />I Sunny Isles Beach, Florida
<br />
<br />a I BRIEF =:JESCRIPTIO'\ (Brief scope Size ccst. ele I AND SPECIFIC ROLE 10 Check If project performec with current firm
<br />r--- '
<br />I A 58,000 SF government complex inclusive of city hall, commission chambers, police facility, and a public library. Due to the
<br />! facility's adjacency to the waterfront, the building will be designed to withstand most hurricanes. Also included is a parking
<br />I garage. Cost: $15M; Role: QAlQC
<br />I
<br />1 (,) TiTLE AND LO_CPTION (City and State)
<br />I
<br />I City of Sunny Isles Beach Heritage Park & Parking Garage
<br />I Sunny Isles Beach, Florida
<br />I
<br />b 1:3: BRIEF DESCRIPTIO!\ (Brief scope. size.
<br /><--
<br />
<br />ap:Y1catli6
<br />
<br />2004
<br />
<br />2004
<br />
<br />(2: YEAR COMPLETED
<br />i PROF~_~SIOr\t,L SERVICES ! COI\STRUCTION (If apolicabie.1
<br />, !
<br />! Ongoing 1 2010
<br />
<br />c:;st etc) AND SPECIFIC ROLE 10 Check if project performeo vVlth curient firm
<br />
<br />I Planning and design for a new parking garage which was incorporated into a new 4-acre community park. The 500+ car garage
<br />! consists of 4-levels of parking and includes functional space for concessions, park support space, and public works at the first
<br />i level. The park component includes a children's playground, plaza and gazebo. Cost: $11 M; Role: QAlQC
<br />I
<br />I
<br />(1) TITLE AND LOCA! ION (City ana Stare) i21 YE.t,R COf,1PLE I ED
<br />
<br />I Collier County Government Center Fixed Term Contract 1 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable!
<br />I Naples, Florida ' Varies (2005-2009) ! Varies (2007-2010)
<br />
<br />i . . .. i 0 Ch k'. rf .. Ie f
<br />C, i (31 BRIEF DESCR.iPTIO!\ (Brief scope. sze. cost etc.: pND SPECIFIC ROLE I lee Ii ;)roJect pe Oimeo \1\'11., cwrenr ,Irm
<br />
<br />II AECOM is providing complete architectural and engineering design services for the Collier County Government Center Fixed
<br />Term Contract. Completed projects include the Courthouse 4th Floor Renovations, Jail Renovations, Chiller Plant Expansion and
<br />I Renovations, Secure Judges Parking Expansion, Building F Elevator Study, and Government Center Master Plan Update.
<br />Role: QA/QC
<br />(1) TITLE AND LOCATION (City and Stare) 2) YEAR COMPLETED
<br />IT< f S rf 'd C 't C t I PROFESSIONAL SERViCES I CONSTRUCTION (if applicable)
<br />I own 0 u Sl e ommunl y en er .
<br />Surfside, Florida ! Ongoing i 2011
<br />I --J----
<br />d. ~_BRIEF DESCRIPTION (Brief scope. Size. cost. ere.; AND SPECIFIC ROLE 10 Check if project performeo with current firm
<br />
<br />I The Town of Surfside selected AECOM to provide comprehensive planning and design services for their new 16,000 SF multi-
<br />I' purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete. The building is
<br />I registered and is expected to meet LEED NC Silver certification. Cost: $5M; Role: QAlQC
<br />
<br />~11 TITCE AND ,OCATION (ory ,c,d SI"" (21 YEAR COMPLETED
<br />: PROFESSIONAL SERVICES I CONSTRUCTION (If appficabie)
<br />I V;lIage of Key B;,cayoe Govemmeot Ceoter ~ I . -
<br />Key Blscayne, FlOrida . 2002 2002
<br />
<br />e. (3\ BRIEF DESCRIPTiON (Bnef scope size cost etc) AND SPECIFIC ROLE 10 Check if project performed with current firm
<br />
<br />A City Hall, Police Headquarters, and public Parking Garage. The project was master planned and designed as a low scale
<br />I campus environment open and accessible to all citizens. The center is located adjacent to the Village's main public park.
<br />I Cost: $6.6M; Role: QAlQC
<br />
<br />I
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1
<br />
|