|
<br />
<br />Erica Nelles, RA, LEED AP
<br />
<br />Architecture - Sustainable LEED Coordinator
<br />
<br />5
<br />
<br />5
<br />
<br />
<br />AECOM Technical Services, Inc., Coral Gables, Florida
<br />
<br />
<br />,-..,,-.:-- "
<br />
<br />Master of Architecture, University of Florida
<br />Bachelor of Science, Bio-Resource Engineering, Rutgers
<br />University
<br />
<br />Registered Architect, Florida
<br />
<br />
<br />As the Sustainable Advocate for AECOM, Erica is responsible for the design and implementation of both internal and client-based
<br />environmentally-sensitive practice. She has developed the "Sustainability & Innovations Assessment" ~ a tool which provides each
<br />of the design disciplines with a project-specific approach to improving the base-line standards for responsible, innovative, and
<br />sustainable design. In addition to this client service, Erica also heads the "Sustainability Working Group" - a multi-disciplinary
<br />collective of AECOM staff, This group reviews all internal AECOM practices
<br />
<br />S RE~E\ANT PRO,IEC,S
<br />
<br />i:~ .: T:T ~E ,L,N;:' ~OC,L,:lO!'~~C/t~,' anc Stars ,2 \fEAR COh~P~EIE='
<br />~~-- . m._~___---~-------~ipROFE~SSj.:lt~AL- SER/iCES j CONSTR~)~CTIOh.! .)1 3DfJilcabiE'
<br />! Town of Surfside Community Center '-------~~----~-------~----
<br />I Surfside, Florida I 2011 I 2011
<br />
<br />a i BRIEF DESCRipTION (Boe: scope. size cost elc,' AND SPECIFIC ROLE 10 Check If prOject perl'ormed with current firrT
<br />
<br />1 The Town of Surfside selected AECOM to provide comprehensive planning and design services for their new 16,000 SF multi-
<br />: purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete. The building is
<br />! registered and is expected to meet LEED NC Silver certification. Cost: $5M; Role: Sustainable LEED Coordinator
<br />
<br />I,'; TIT~E AND ~OCATION (City and State) I (2; YEAR COMPLETED
<br />
<br />I Broward County Regional Library & Children's Museum --l PROFESSIO',AL SERVICES i CONSTRUCTION (If apDlicable)
<br />
<br />I Davie, Florida I Ongoing 1 2011 (est.)
<br />
<br />b. : i3; BRIEF DESCRIPTION (Boe:scope size cost. s'e , AND SPECIFIC RO~E 10 CheCK If prOject perform~d With current ',rm
<br />
<br />I This 55,000 SF Interactive Children's Museum will have three primary components: a museum, an art institute and an auditorium.
<br />I The museum component will be 30,000 SF and will provide educational and arts experiences for children of the region, a
<br />17,000 SF Art Institute and a 5,000 SF auditorium will be used for special public assembly events involving the museum and the
<br />I community. Cost: $14M; Role: Project Architect
<br />I
<br />~ TITLE AND ,-OCATION (City and State)
<br />
<br />I Town of Cutler Bay, Sustainability Plan
<br />I Cutler Bay, Florida
<br />I
<br />v. I (3: BRIEF DESCRIPTION (Brief sco{)e Size cost. ete) AND SPECIFIC ROLE 10 CheCK if prOject performed with current firm
<br />
<br />I AECOM is developing a Comprehensive Sustainability Plan for the Town of Cutler Bay. Sustainability-focused policies and
<br />I practice, In areas such as site design and bUilding planning, bUilding performance, energy and water effiCiency, material
<br />I selections, indoor air quality, etc., are aimed at positioning the Town of Cutler Bay at the forefront of a sustainable South Florida.
<br />
<br />I ~~I~iT~~s~~i~aL~~:;~~~c;c~;:~;~~ate) 1 (2; YEAR COMPLETED
<br />
<br />! C't fOld St' b'I't C It t I PROFESSIONA~ SER\/ICES CONSTRUCTION (If applicable)
<br />I I Y 0 smar us alna I I Y onsu an I-~~
<br />IOldsmar, Florida I 201 0 ~ I 2010
<br />
<br />d. ~ BRIEF DESCRIPTION (Brief scope. SIZe. cost. etc.) AND SPECIFIC ROLE i 0 Check if project performed with current firm
<br />
<br />I Working with AECOM Water, Erica performed as the sustainability con~ultant on the City's new Water Treatment Plant which
<br />included administrative office and mechanical equipment areas. The building will be the City's first LEED NC Silver project. The
<br />project included significant coordination of all design consultants and with City I Water Treatment staff.
<br />Role: Sustainable Coordinator
<br />
<br />. I !~ vE~ COMPLETED
<br />I PROFESSIONAL SERVICES
<br />I
<br />I
<br />I
<br />I
<br />
<br />2009
<br />
<br />I CONSTRUCTION 'If aop/lcablG,'
<br />I N/A
<br />
<br />i (1) TITLE AND LOCATION (City and State) ! (2) YEAR COMPLETED
<br />I I PROFESSIO!\)AL SERVICES CONSTRUCTION (If applicable) ,
<br />
<br />Text I 2009 I 2010
<br />
<br />e, 1(3) BRIEF DESCRIPTION (Bnef scope size cost etc J AND SPECIFIC ROLE 10 Check If pcoJect perfOrm~d With current firm
<br />
<br />I AECOM was hired to undertake the task of replaCing an eXisting scho'ol by constructing new faCilities in phases on the eXisting
<br />open spaces (playing fields) while keeping the school fully operational. This will be the first senior high school constructed by
<br />Miami-Dade County Public Schools using Academy components to create small learning communities that encourage student
<br />I interaction within each related academic area. Cost: $86M; Role: Project Architect; Project Size: 371,000 SF
<br />
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1
<br />
|