My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aecom
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Aecom
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:44:54 AM
Creation date
11/10/2010 9:44:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />:' -:-__~, :",',,: ~_::=I'=:L~;'=)I"\ ICi~~ 3'1:' StE<E <br /> <br />:~/_::: =",~,'tJ;:::~_::-E=- <br /> <br />Miami-Dade County Corrections Master Plan and 2000 <br />Bed Krome Facility <br />Miami, Florida <br /> <br />i <br />I <br />["---- <br /> <br />-- -=:-r\:. -::;' j"- ~I~' <br /> <br />2008 (master plan) <br /> <br />N/A <br /> <br />,CK ,~~ ,1\, '- <br /> <br />=- <br /> <br />\~,..." <br /> <br />:::=;.::, \ < -" '-~!;- <br /> <br />, ,~~ '\LJ/iE <br /> <br />'.:01\ -/-,'=~ -'c:_=-=-:>-t:=,!'\E <br /> <br />Miami-Dade County <br />General Services Administration (GSA) <br /> <br />u:: =:.==- :iE S=:::::',,;::::~;C'\ ,:=.:c <br /> <br /> <br />786.263.6010 <br /> <br />AECOM is providing comprehensive master planning and design servic- <br />es for the Miami-Dade County Corrections and Rehabilitation Department. <br />The Master Plan involves a detailed analysis of the current and projected <br />inmate population, the current and proposed operational standards, and <br />an in-depth physical assessment of the six major facilities currently in op- <br />eration within the County. The consultant team led by AECOM is defining <br />and evaluating multiple strategic alternatives which will become the base <br />for the final Master Plan. A 2000 bed facility is being designed for the <br />Krome site to be implemented as the first phase of the Master Plan. The <br />new facility contains 34 housing units for minimum, medium, and maxi- <br />mum classifications, as well as a full complement of support services. <br />These include a central cook-chill kitchen for the entire county system. <br /> <br />Project Size: 2,000 bed <br />Project Cost: N/A <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />· (1) FIRfvl NAME <br />! AECOM Technical Services, Inc. <br />a I <br /> <br />(2) FIRM LOCATION (City and State) <br />Coral Gables, Florida <br /> <br />(3) ROLE <br />Architecture, Building Engineering, <br />! Masterplanning, Programming <br />I <br />STANDARD FORM 330 (6/2004) PAGE 1 <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.