Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Landscape Architect <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL lb. WITH CURRENT FIRM <br /> <br />28 I 15 <br /> <br />Barrv Miller <br />15, FIRM NAME AND LOCATION (City and State) <br />Savino Miller Design Studio <br />16. EDUCATION (DEGREE AND SPEC(AUZA nON) <br /> <br />Master of Urban and Regional Planning, U of <br />Florida, 1984 <br />Bachelor of Landscape Architecture, U of <br />Florida, 1979 <br /> <br />North Miami, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPUNE) <br />Florida Landscape Architect (#866) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Pub(ications, Organizations, Training, Awards, etc.) <br /> <br />Member ASLA/FASLA, Perf. Arts Center Building Committee, Trans. Aesthetic Review Committee; <br />FAPA Goldcoast Section Award of Excellence, 2007, FLASLA Excellence in Design and Stresau <br />Award, 2007, AlA Outstanding Landscape Architect, 2004. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Pointe Park Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. <br /> Site Master Plan with Hargreaves and Associates, Schematic through Construction <br /> Documents and Administration for planting. 20 acre park with sweeping dunes, interactive <br /> fountains, ocean front walk, cafe plaza and park vignettes. $23 Million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sunny Isles Beach City Hall Sunny Isles PROFESSIONAL SERVICES rONSTRUCTION (If applicable) <br /> Beach, FL 2005 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b. <br /> Master Plan, Schematic through Construction Documents and Administration for planting, <br /> paving, irrigation, and site lighting. The open space design integrates the City Hall <br /> and adjacent restaurant with continuous seating, small courtyard, and a large fountain <br /> that embraces the council chambers. 4 acres. $750,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Espanola Way Streetscape Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2002 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope, size" cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. <br /> Master Plan, Schematic through Construction Documents and Administration for planting, <br /> paving, irrigation and site lighting. A continuous curb-free plaza was built to <br /> encourage street festivals and social interaction alternating with parking, including a <br /> design sensitivity to the historic village setting. 2 acres. $400,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Homestead Bayfront Park Master Plan Homestead, FL PROFESSIONAL SERVICES /CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. <br /> Master Plan for one of five designated Heritage Parks in Miami-Dade County. Project <br /> called for sustainable design solutions and restoration of greenspace into a biodiverse <br /> ecological habitat. FAPA Award recipient. 92 acres. $18 Million. <br /> ( 1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Surfside Community Center Surfside, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost.. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />e. <br /> On-going. Master Plan, Schematic through Construction Documents for planting, paving, <br /> irrigation, and site lighting. Water park adjacent to Community Center includes water <br /> features, recreational pools, pool deck for active and passive recreation. 1.5 acres. <br /> $27 Million. <br /> <br />STANDARD FORM 330 (6(2004) PAGE 2 <br />