Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Architect <br /> <br />14, YEARS EXPERIENCE <br />a. TOTAL lb. WITH CURRENT FIRM <br /> <br />23 I 16 <br /> <br />Adriana Savino <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Savino Miller Design Studio, North Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />Bachelor of Architecture, University Central <br />Venezuela, 1979 <br />Master of Architecture + Urban Design <br />Certificate, University of Pennsylvania, 1982 <br /> <br />de <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Architecture <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training" Awards, etc.) <br />2007 FAPA Gold Coast Section, Award of Excellence, Homestead Bayfront Park. 2007 FLASLA <br />Award of Excellence in Design for La Casa de Korge. 2007 FLASLA Frederick Stresau Award of <br />Design for La Casa de Korge. 2004 AlA Outstanding Landscape Arch. of Year Award,Miami Chapt <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Homestead Bayfront Park Homestead, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2006 <br /> (3) 8RIEF DESCRIPTION (Brief scope, size, cost" etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. <br /> Master plan for existing park including phasing, implementation for one of nine Dade <br /> County Heritage Parks. Create a budget for future improvements. $18 million. Project <br /> manager + master planner <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 41st St. Bridge over Indian Creek & Miami Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Biscayne Waterways 1996 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size" cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b. <br /> From master planning to implementation of the bridge as part of the beautification of <br /> 41st Street. Project manager & project designer for bridge improvements, tiles, <br /> railings, and lighting design. $42 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Tamiami Canal Bridge & Neighborhood Miami, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicab)e) <br /> Master Plan 2008 <br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. <br /> Master plan for the neighborhood and analysis of bridge tender house alternatives up to <br /> design development of prefered alternative to create an image for the bridge and tender <br /> house. $0 - planning study only. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Biscayne Pointe GO Bond Mi ami, FL PROFESSIONAL SERVICES ICONSTRUCTlON (If applicable) <br /> Neighborhood Beautification 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. <br /> Masterplanning for the neighborhood design of Biscayne Point entry bridge and Stillwater <br /> entry and signage. From master plannning to construction documents, urban design and <br /> architectural components. $1 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Costa D'Este Hotel Vero Beach, FL PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> 2006 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />e. <br /> Specific role in the reconfiguration of the site planning and approach to the hotel. The <br /> scope for the hotel was site planning and improvements for all outdoor components. $22 <br /> million. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />